My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-01-09_PERMIT FILE - M2019055
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2019055
>
2020-01-09_PERMIT FILE - M2019055
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 4:16:26 PM
Creation date
1/10/2020 2:32:47 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2019055
IBM Index Class Name
PERMIT FILE
Doc Date
1/9/2020
Doc Name
Application
From
James & Yvette Downing
To
DRMS
Email Name
ERR
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT C-Mining Plan <br /> Rule 6.3.3 (Starts on Page 136 of the Rules) <br /> The purpose of the mining plan is to describe how mining will affect the permit area through duration of the <br /> operation. The plan must be correlated to Exhibit E—Map. <br /> 1) Estimated dates of commencement: 01042020 and completion: 01102020 <br /> 2) How many years is the mine anticipated to be operational: 2-5 years <br /> 3) Will mining activities occur all-yearlong or just seasonally when weather permits (check one): <br /> (_[2)all-yearlong or(ED seasonally,explain: Permafrost sets in around October and it's hard to cl ie). <br /> 4) How many aces of the mine site will be disturbed at any given time: 1/4 acres <br /> 5) Depth of topsoil to be salvaged (only for surface disturbances) (check one): <br /> 4-6 inches =6-8 inches <br /> F-1_8-10 inches =10-12 inches <br /> _✓�Other: 5-10 feet <br /> N/A, explain: <br /> 6) Will you need to move any overburden (check one): (=)Yes or(_a)No <br /> a. If yes,approximately how thick is the overburden? feet <br /> 7) How will the mine be accessed: (Z)existing roads d:1) new roads will be created <br /> Please describe the existing roads: <br /> a. If there will be new roads or road improvements, please describe the new roads and road <br /> improvements: <br /> ro,v o W(11 t,t i1- a i z-TV -", t;/ _/re.a Z, ZV/l •14 6Yle? J <br /> l"z/l 7.?iC'!/14 rii t n t 2., <br /> 8) Will water be needed during the mining operation (check one): (]:])Yes or(JZ)No <br /> a. If yes, please describe the source of the water and how much water will be used during the <br /> operation: <br /> 9) Will any water diversions or impoundments be constructed (check one): (JO)Yes or(-Z)No <br /> a. If yes, please describe the water diversions or impoundments: <br /> 10)Will any chemicals be used during the mining process (check one): (J:J)Yes or(2L)No <br /> a. If yes,please describe the chemical types and quantities to be utilized,chemical storage and <br /> spill containment and emergency response plans for on-site spills. Plant operation details <br /> should include tank capacities and operating solution volumes: <br />
The URL can be used to link to this page
Your browser does not support the video tag.