My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-01-09_PERMIT FILE - M2020002
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2020002
>
2019-01-09_PERMIT FILE - M2020002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2025 2:53:59 AM
Creation date
1/10/2020 2:31:58 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2020002
IBM Index Class Name
PERMIT FILE
Doc Date
1/9/2019
Doc Name
Application
From
Fremont Paving and Redi-Mix
To
DRMS
Email Name
DC1
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PO M 461001352 <br /> Routing#:20-HA4-ZG-03040 <br /> STATE OF COLORADO CONTRACT <br /> COVER PAGE <br /> State Agency Agreement Number <br /> Colorado Department of Transportation 20-HA4-ZG-03 <br /> Contractor Contract Performance Beginning Date <br /> A&S CONSTRUCTION COMPANY Shall be the Effective Date of the approval of the <br /> State Controller or designee. <br /> Contract Maximum Amount Initial Contract Expiration Date <br /> $18,957,249.00 Shall be five years from the Effective Date or the <br /> Contract Encumbrance Amount date of final acceptance of the project whichever <br /> $9 649 818.00 State Fiscal Year occurs fast. <br /> Contract Purpose <br /> Fumish all Materials and perform all services not specifically excepted in this Contract that are necessary or <br /> incidental to the complete construction of Colorado Project No.STA 0711-018(20853)consisting of highway <br /> and bridge construction or maintenance consisting of RESURFACING OF SH 71 MP 63.8 - 100.9 WITH <br /> STRUCTURE REPAIR,located on SH 71 SOUTH OF LIMON STRUCTURES AND RESURFACING in <br /> Lincoln County in the State of Colorado as described in the Plans and Specifications for the project <br /> incorporated herein by reference. <br /> Exhibits and Order of Precedence <br /> The following Exhibits and attachments are included with this Contract: <br /> 1. Exhibit A—Contractor Bid Proposal <br /> 2. Exhibit B—Performance Bond <br /> 3. Exhibit C—Payment Bond <br /> 4. Exhibit D—Federal Requirements <br /> 5. Exhibit E—Contract Modification Order <br /> 6. Exhibit F—Payment Schedule <br /> 7. Exhibit G—Sample Option Letter <br /> 8. Exhibit H—Contractor's Authorized Agents <br /> 9. Exhibit I—Required Contract Provisions Federal-Aid Construction Contracts <br /> In the event of a conflict or inconsistency between this Contract and any Exhibit or attachment,such conflict <br /> or inconsistency shall be resolved by reference to the documents in the following order of priority: <br /> 1. Exhibit I—Federal Requirements <br /> 2. Colorado Special Provisions in§20 of the main body of this Contract <br /> 3. Special Provisions for the Project <br /> a. Project Special Provisions <br /> b. Standard Special Provisions <br /> 4. Project Plans <br /> 5. Project Specifications <br /> 6. The provisions of the other sections of the main body of this Contract <br /> 7. Exlubit A—Contractor's Bid Proposal <br /> 8. Exhibits B through I in descending order <br /> Principal Representatives <br /> For the State: For Contractor. <br /> Travis Miller Nick Phillips <br /> Colorado Department of Transportation(R4) A&S CONSTRUCTION COMPANY <br /> 401 A Avenue 366 839 MACKENZIE AVENUE <br /> Limon,CO 80828 CANON CITY,CO 81215-0566 <br /> 719.775-8002 719-275-4555 <br /> travis.miller@state.co.us <br /> Document Builder Generated Page 1 of 55 Version 0819 <br />
The URL can be used to link to this page
Your browser does not support the video tag.