My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-01-09_REVISION - M1977211
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977211
>
2020-01-09_REVISION - M1977211
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:44:29 PM
Creation date
1/9/2020 1:17:29 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977211
IBM Index Class Name
Revision
Doc Date
1/9/2020
Doc Name
Adequacy Review Response #2
From
Continental Materials Corporation
To
DRMS
Type & Sequence
AM4
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-4- <br /> 12. Primary future(Post-mining)land use(check one): <br /> Cropland(CR) Pastureland(PL) 17-1 General Agriculture(GA) <br /> Rangeland(RL) JI I Forestiy(FR) Wildlife Habitat(WL) <br /> Residential(RS) I Recreation(RC) Industrial/Commercial(IC) <br /> r-- <br /> Ti Developed Water Resources(WR) _0 Solid Waste Disposal(WD) <br /> 13. Primary present land use(check one : <br /> i <br /> Cropland(CR) Pastureland(PL) General Agriculture(GA) <br /> Rangeland(RL) Forestry(FR) 11 Wildlife Habitat(WL) <br /> Residential(RS) Recreation(RC) I Industrial/Commercial(IC) <br /> Developed Water Resources(WR) <br /> 14. Method of Mining: Briefly explain mining method(e.g.truck/shovel): <br /> Ripping, dozer push, truck and shovel, with drill and blast as needed <br /> 15. On Site Processing: 111 Crushing/Screening <br /> 13.1 Briefly explain mining method(e.g.truck/shovel): <br /> Crushing, screening, washing and stockpiling of aggregate materials <br /> List any designated chemicals or acid-producing materials to be used or stored within permit area: <br /> Vehicle fuel <br /> 16. Description of Amendment or Conversion: <br /> If you are amending or converting an existing operation,provide a brief narrative describing the proposed change(s). <br /> This amendment is a revision to the reclamation plan to stabilize and reclaim the quarry with a <br /> new plan that reduces the volume of earthworks and reduces the visibility of the quarry. The <br /> amendment is necessary due to little to no future mining at the property. The applicant has <br /> reassessed the reclamation plan as part of its review of the staged approach to reclamation and <br /> developed an approach that is better suited for the site. <br />
The URL can be used to link to this page
Your browser does not support the video tag.