Laserfiche WebLink
Conclusion <br /> Rule 1.1 (49)Mineral Rules defines a"technical revision" as a change in the permit <br /> which does not have more than a minor effect upon the approved or proposed reclamation plan. <br /> I believe that the above actions/narratives fall within this definition and believe that a grant of the <br /> requested technical revision is appropriate. <br /> This letter also is a further corrective action response letter updating and clarifying prior <br /> submittals to the Division on these issues. <br /> Respectfully submitted, <br /> Rudolph on/ . . � <br /> 244/ <br /> Attachmen <br />