Laserfiche WebLink
swim�sreme, r�1M� �� <br /> _ • w <br /> y: <br /> ti <br /> Wildlife fence construction is progressing at the passive treatment ponds. Please submit an MR is the disturbance <br /> boundary will be changed with fence construction. <br /> TOPSOIL—Rule 4.06 <br /> Removal 4.06.2; Substitute Materials 4.06.4(4); Storage and Protection 4.06.3; Redistribution 4.06.4: <br /> Topsoil piles along 6MN road need to be better protected from road snow removal. The plow appears to <br /> be getting very close and possibly and gouging into the topsoil. Moving these piles can be discussed in a Minor <br /> Revision if needed. <br /> DOCUMENTS RECEIVED <br /> OTHER(SPECIFY) <br /> ENFORCEMENT ACTIONS/COMPLIANCE <br /> No enforcement actions were initiated as a result of this inspection,nor are any pending. <br />