My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-12-18_GENERAL DOCUMENTS - C1981019
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981019
>
2019-12-18_GENERAL DOCUMENTS - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 4:09:47 PM
Creation date
1/7/2020 9:25:41 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
General Documents
Doc Date
12/18/2019
Doc Name Note
For SL17
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Colowyo Coal Company
Permit Index Doc Type
Findings
Email Name
ZTT
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. Performance of the reconstructed topography. Symptoms of failure or instabilities such as <br /> slumping or exposed highwalls were examined; <br /> 3. Hillslope design/function with regard to erosion; <br /> 4. Swales and depressions with regard to numbers of features and effect on post-mining land <br /> use; <br /> 5. Blending of regraded land to undisturbed areas; <br /> 6. The functioning of drainages with regard to knickpoints,blending at disturbance boundaries <br /> and channel erosion; <br /> 7. Erosional features; and <br /> 8. Drainage control for the reclaimed area, including upslope diversions. <br /> Colowyo AUSiR)1UUfW IIKQSUW U SU-KffUIQmFFRLSI�BkRule 2.05.4. Colowyo was <br /> granted a variance for contemporaneous reclamation for the East Pit, West Pit and the South <br /> Taylor Pit due to the nature of multi-seam mining. Backfilling and rough grading commenced <br /> once a steady-state condition was reached in each of the pits. <br /> The approved backfilling and grading plan for the Colowyo Mine is found in Volume 1 (East and <br /> West Pit), Volume 12 (South Taylor), and Volume 15 (Collom) of the PAP. Maps 19, 19A and <br /> 19B show the approved post-mining topography, Maps 29 and 29A, and 29B show the <br /> backfilling and grading schedule. The pre-mining and post-mining cross-sections are shown on <br /> Maps 20, 20A and 20B, and the permanent drainage channel profiles are shown on Maps 33, <br /> 33A, 33B, and 33C. Map 1 of the SL-17 application show cross-section area for the 0.4 acres <br /> being requested of the South Collection Ditch, including approved post-mining topography <br /> alongside the constructed topography. <br /> The approved drainage reestablishment consisted of the design and construction of permanent post <br /> mining drainage channels. The post-mine channel locations are shown on Maps 41, 4 1 A and 4 1 B <br /> of the Colowyo PAP. The South Collection Ditch construction designs can be found in Exhibit 7 of <br /> the Colowyo PAP. <br /> Phase II Bond Release <br /> Proposed Decision and Findings of Compliance December 18,2019 <br /> Partial Phase I,II and III Bond Release SL-17 Page 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.