My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-12-18_GENERAL DOCUMENTS - C1981019
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981019
>
2019-12-18_GENERAL DOCUMENTS - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 4:09:47 PM
Creation date
1/7/2020 9:25:41 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
General Documents
Doc Date
12/18/2019
Doc Name Note
For SL17
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Colowyo Coal Company
Permit Index Doc Type
Findings
Email Name
ZTT
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
of the South Collection Ditch which is permitted as a permanent structure as requested by the <br /> landowner, CSLB. The request from the landowner for the portion of ditch to remain as a <br /> permanent structure is found in Volume 2A, Exhibit I in the Colowyo Permit Application <br /> Package (PAP). Map 1 of the SL-17 application, as well as Figure 1 of this document, show the <br /> portion of the South Collection Ditch being requested for bond release. The bond release area is <br /> located in the Colowyo 0 IQINBection 16 Pit in portions of Township 3 North, Range 93 West of <br /> the 6th Principal Meridian, Section 16 ❑SE 1/4 E 1/2. The permit area can be found on the USGS <br /> Quadrangle 7.5 Minute Series Maps of Axial and Nine Mile Gap. The permit area and surface <br /> ownership can be found on Map 1, and the coal ownership can be found on Map 2 of the <br /> Colowyo PAP. <br /> Background <br /> The East Pit and West Pit mining sites lie just west of the northward flowing Goodspring (also <br /> referred to as Good Spring) Creek,which is paralleled by Colorado Highway 13. The area <br /> includes gently sloping uplands and valleys that cut into the upland surface. These valleys are <br /> generally narrow, v-shaped, and about 250 to 500 feet deep. Elevations range from <br /> approximately 7,650 feet in the upper portion of East Pit reclamation to 6,950 feet near East <br /> Taylor Pond. <br /> Mining operations began in 1976 with the East Pit, a multi-seam coal operation that continued to <br /> move in a southerly direction. Eight coal seams (Y,X, A, B, C, D, E, F) were mined from the <br /> East Pit, ranging in thickness from two to fifteen feet. The East Pit is nearly 6,000 feet from east <br /> to west(width), 1,000 feet in breadth (highwall to highwall), and 450 feet deep. Due to the <br /> number of coal seams, immense size of the pit, and manpower and equipment employed,pit <br /> progression was slow, with additional disturbances of approximately 40 to 50 acres per year. <br /> Extraction of coal from the East Pit was terminated in 2006. All reclamation activities have been <br /> completed in the East Pit and is in the required final revegetation stages. <br /> The West Pit is located to the west of the East Pit. The method of operation utilized in, and the <br /> coal seams extracted from, the West Pit were the same as those of the East Pit. The West Pit was <br /> roughly the same overall size as the East Pit. Mining in the West Pit advanced from the north to <br /> south, paralleling the movement of the adjacent East Pit. Mining operations in the West Pit were <br /> completed in 2015. Reclamation activities remaining in the West Pit include backfilling, <br /> grading, reduction of the highwall, and revegetation. <br /> Colowyo is continuing to perform reclamation maintenance and activities in the East Pit and <br /> West Pit. Reclamation in the East Pit and West Pit is expected to conclude in 2029. <br /> Operations in the South Taylor Pit began after the approval of PR-02 in 2007. This pit is located <br /> north and west of the northward flowing Good Spring Creek and southwest of the West Pit. It <br /> lies partially in Rio Blanco County. In the South Taylor Pit, 17 seam and sub-seam complexes <br /> are mined. The seams are the A, B, C, D, E, F and G seams and their seam complexes (for <br /> Proposed Decision and Findings of Compliance December 18,2019 <br /> Partial Phase I,II and III Bond Release SL-17 Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.