My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-12-31_REVISION - C1981022 (15)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981022
>
2019-12-31_REVISION - C1981022 (15)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 4:06:52 PM
Creation date
1/6/2020 10:36:15 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981022
IBM Index Class Name
Revision
Doc Date
12/31/2019
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Oxbow Mining, LLC
Type & Sequence
RN7
Email Name
LDS
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
from the Sanborn Creek Fansite. Hubbard Creek Pond controls sediment from <br /> the Upper Hubbard Creek facilities area and the East Yard Pond controls <br /> sediment from the east yard of the Elk Creek facilities yard. One additional <br /> pond was approved for treatment of underground discharge from the Sanborn <br /> Creek portals and will be retained for use with the water treatment plant for the <br /> town of Somerset. Specific plans are found within section 6 of Exhibit 2.05-E3 <br /> in the PAP, (Vol. 10). All ponds are designed in compliance with Rule 4.05.6. <br /> E. Acid-forming and Toxic-forming Spoil <br /> 1. There is no evidence of acid- or toxic-forming material at this site. <br /> F. Impoundments <br /> Refer to Section D, Sedimentation Ponds, above. <br /> G. Surface and Ground Water Monitoring <br /> 1. The applicant will conduct monitoring of ground water in a manner approved <br /> by the Division. The ground water monitoring plan is specified on Page 2.04- <br /> 41of the PAP (4.05.13(1)). <br /> 2. The applicant will conduct monitoring of surface water in a manner approved <br /> by the Division. The monitoring plan was submitted under 2.05.6(3)(b)(iv) and <br /> as specified on page 2.05-46iii of the PAP (4.05.13(2)). <br /> H. Discharge of Water into an Underground Mine <br /> 1. The Division approved the transfer of mine water from the Elk Creek D seam <br /> workings to the abandoned Somerset B seam workings. Initially, a water <br /> transfer well was approved in TR-47 to the Somerset C seam working, but a <br /> coal seam rib was encountered. The drill hole was extended to the B seam in <br /> TR-50. The volume of transferred water, pH and total suspended solids are <br /> reported each year in the annual hydrology report. The well is located in the <br /> Elk Creek facilities area and is known as well D2B. <br /> 2. The Division approved a second mine water transfer well from the Elk Creek D <br /> seam workings to the abandoned Somerset B seam workings in TR-51. The <br /> volume of transferred water, pH and total suspended solids are reported each <br /> year in the annual hydrology report. The well is located at the Hubbard Creek <br /> Fansite area and is known as well D2B2. <br /> 1. Stream Buffer Zones <br /> 1. The Division has approved surface and underground mining activities within <br /> 100 feet or through perennial streams. This decision was based on a finding <br /> 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.