Laserfiche WebLink
41 <br /> J. E. STOVER & ASSOCIATES, INC. <br /> 2352 NORTH 7T"STREET,UNIT B <br /> GRAND JUNCTION,COLORADO 81501 <br /> PHONE:(970)245-4101,FAX:(970)242-7908 <br /> MINE ENGINEERING CIVIL ENGINEERING <br /> MINE RECLAMATION CONST. MANAGEMENT <br /> December 19, 2019 <br /> Rob Zuber <br /> Division of Reclamation, Mining&Safety RECEIVED <br /> 1313 Sherman St., Room 215 <br /> Denver, CO 80203 DEC 2 4 2019 <br /> Re: Bowie Resources, LLC, Bowie No. 2 Mine DIVISION OF RECLAMATION <br /> Midterm Permit Review, MT-05 MIN ING AND SAFETY <br /> Permit C-1996-083 <br /> Dear Mr. Zuber: <br /> On behalf of Bowie Resources, LLC, (BRL), enclosed is the response to the questions listed in Section VI of <br /> the MT-05 Findings Document. <br /> 1. DRMS: If there have been any changes to the ownership and control information for BRL <br /> since RN-04, BRL needs to provide updated identification of interests information as required <br /> by Rule 2.034. <br /> BRL: Ownership and control information was updated with MR-198,therefore no changes are <br /> attached. <br /> 2. DRMS: BRUs current use of%culverts for erosion control should be included in the PAP. One <br /> potential location for this discussion is on page 2.05-114, and this practice could be described as <br /> an additional measure for sedimentation control for surface water runoff(in addition to the use <br /> of sedimentation ponds). It could also be discussed in Exhibit 8 of Volume III and in the sediment <br /> control sections in Volumes IX and XI. The particular use of these structures on gob piles (for <br /> example Gob pile#3) should be discussed in the applicable volumes (for example Volume XI). <br /> The discussion could be included in the section Water Control measures. <br /> BRL: Please see revised pages 2.05-114,Volume XI page 6(entire section included due to revised <br /> page numbering),Volume IX page 12. <br /> 3. DRMS: If there have been any changes to Maps 1 and 2(Volume 11)since RN-04,BRL needs to <br /> update these two maps. Also,as necessary,please update any access agreements(Volume III). <br /> BRL: Please see revised Map 01,there have been no changes to the Coal Ownership at the mine. <br /> New access agreements are in Volume 1116,Tab 25. Also, see attached revised Table of Contents for <br /> Volume 1116 page vi. Please also see pages 2.03-5&7 for updated landowner contact information. <br /> 4. DRMS: On the facilities maps,(e.g. Map 15-3), please clarify the material in the piles labeled <br />