EXHIBIT C-Mining Plan <br /> Rule 6.3.3 <br /> The purpose of the mining plan is to describe how mining will affect the permit area for the duration of <br /> the operation. <br /> 1) Estimated dates of commencement: and completion: <br /> Note: Reclamation of all affected lands shall be completed within 12 months after issuance of the <br /> permit. An Operator possessing a I I I(1)(b) Reclamation Permit must convert to the appropriate <br /> regular construction materials permit if extraction and export of materials from the site are not <br /> completed within 12 months after the issuance of the permit. <br /> 2) Depth of topsoil to be salvaged (check one): <br /> 4-6 inches _f_6-8 inches <br /> 8-10 inches 10-12 inches <br /> Other: <br /> N/A,explain: �l�l - y10 � <br /> 3) Description of how topsoil will be stockpiled and stabilized: <br /> 4) Thickness of overburden needed to be moved: feet or N/A <br /> 5) Thickness of deposit to be mined: feet �� l p <br /> P i � / : tAw 0' ` <br /> 6) How will the mine be accessed:0 existing roads (0) new roads will be created <br /> a. Ple se describe the existing r s: <br /> 2 <br /> b. If there will be new roads or road improvements, please describe the new roads and road <br /> improvements(note, new roads must be included in permitted acreage): <br /> 7) Will water be needed during the mining operation (check one): 0 Yes or d:j)No <br /> a. If yes, please describe the source of the water and how much water will be used during the <br /> 0p ration: <br /> G <br />