My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-12-23_REVISION - M1977342
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977342
>
2019-12-23_REVISION - M1977342
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/17/2021 3:06:28 PM
Creation date
12/26/2019 1:02:06 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977342
IBM Index Class Name
Revision
Doc Date
12/23/2019
Doc Name
Status Update
From
Climax Molybdenum
To
DRMS
Type & Sequence
AM7
Email Name
PSH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Henderson Mine Water System through Intake No. 2 <br /> and Intake No. 3 and delivered through the Henderson <br /> Mill Potable Water Pipeline 'and the Ute Creek Pipe- <br /> line. <br /> h. • los't Creek Reservoir. <br /> The Lost Creek Reservoir derives its suppy of <br /> water from Lost Creek, a tributary of the Williams • <br /> Fork River. The initial point of survey is at <br /> a point whence AP 8 of Bureau of Land Manage- <br /> ment Exchange Survey No. 375 in the Arapahoe ' <br /> National Forest in unsurveyed Township 2 S., <br /> Range 78 and 79 West of the 6th P.M., located in <br /> Section 8, Township 2 South, Range 78 West of the <br /> 6th P.M., bears North 81°37'30" West a distance <br /> of 3,543 feet. The maximum height of the dam <br /> is 100 feet and the length of the dam will be <br /> 905 feet; the reservoir capacity will be 80 <br /> acre feet below the bottom of outlet tube and 1900 • <br /> acre feet above the bottom of outlet tube. <br /> The water impounded in the Lost Creek Reservoir <br /> will be delivered into the Henderson Mine Water <br /> System by release from the reservoir into Lost <br /> Creek, and interception and. delivery through 3 <br /> Henderson Mine Water System Intake 5, and the • <br /> water impounded in Lost Creek Reservoir will <br /> also be used for the irrigation of lands belonging <br /> to claimant below said reservoir. <br /> IT IS FURTHER ORDERED, ADJUDGED AND DECREED that the <br /> water to be diverted through intakes 1 to 5 inclusive and stored <br /> in the Lost Creek River Reservoir, the Ute Creek Reservoir and <br /> the East Branch Reservoir in this Change of Water Right proceeding <br /> - 9 - <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.