Laserfiche WebLink
five alternate points of diversion decreed to the Henderson <br /> Mine Water System, including the 'right to store water in the <br /> East Branch Reservoir, the Ute Creek Reservoir, and the ' <br /> Lost Creek Reservoir or one or more of them, in the manner <br /> and for the beneficial uses decreed by this Court in Case <br /> No. W-528 and as described in the decretal portion hereof. <br /> 5. Applicant seeks authority to divert through <br /> the alternate headgates of the Henderson Mine Water System <br /> not exceeding 1.5 cubic feet of water per second adjudicated <br /> to the Ute Park Ditch, Priority No. 205-A from October 1 <br /> to May 15, not exceeding a consumptive use 'of 168 acre <br /> feet annually. <br /> 6. Applicant seeks authority to divert into the • <br /> Henderson Mine Water System up to 10.5 cubic feet of <br /> water per second from May 15 to September 30 in the order <br /> of priority listed hereinafter, with a maximum volumetric <br /> diversion and consumptive use of 704 acre feet annually, <br /> less amounts 'diverted under Priority No...205-A between <br /> October 1 and May 15 as stated in Paragraph 5 hereof. <br /> 7. Applicant declares, conditioned upon approval <br /> of said maximum amount of 704 acre feet annually of con- <br /> sumptive use of water, that water rights in excess of <br /> such amount'shall be decreed abandoned by relinquishment. <br /> 8. That the change in points of diversion and <br /> change in use sought by the Applicant with a volumetric <br /> limitation of 704 acre feet annually of consumptive use <br /> will not exceed the quantities of water decreed to said <br /> ditches and will not, under the conditions proposed, <br /> injuriously effect the owner of or persons entitled to <br /> use water under a vested water right or a decreed <br /> conditional water right and will not cause an enlarge- <br /> ment of the uses decreed to the said ditches. <br /> - 2 - <br /> 1 <br /> :a <br /> 4 <br />