Laserfiche WebLink
Table 2-1 <br /> Incidental Water Rights <br /> Henderson Mill <br /> Climax Molybdenum Company <br /> (1) (2) <br /> Decreed <br /> Amount Appropriation Adjudication Admin <br /> Structure (cfs) Source Date Date Number Priority <br /> Ute Park Ditch 5.0 Ute Creek 05/15/1897 08/03/1911 20676.17302 205-A <br /> Story No. 1 Ditch 0.5 Ute Creek 06/15/1897 08/03/1911 20676.17333 205-B <br /> Story No. 2 Ditch 0.5 Ute Creek 06/05/1897 08/03/1911 20676.17323 205-C <br /> Story No. 3 Ditch 0.8 Ute Creek 06/15/1897 08/03/1911 20676.17333 205-D <br /> Story No.4 Ditch 0.5 East Fork Ute Cr. 05/31/1898 08/03/1911 20676.17683 211 <br /> (3) Wade Reed Ditch 3.2 So. Fork WFR 06/01/1901 08/03/1911 20676.18779 218 <br /> Notes: <br /> (1) Originally adjudicated in CA-183. <br /> (2) Administration number obtained from CDSS water rights database(http://cdss.state.co.us/). <br /> (3) Original water right was 7.5 cfs. In Case No.W-528-76,4.3 cfs was abandoned and 3.2 cfs was <br /> transferred to the Henderson Mill. <br /> Spronk Water Engineers, Inc. <br />