Laserfiche WebLink
Table 7b <br /> Shores Gravel Pit <br /> Evaporative and Operational Losses with Replacements <br /> (all values in acre-feet) <br /> (1) (2) (3) (4) (5) (6) (7) (8) <br /> Month Total Net De-Watering Total EOM Diversion Rural Ditch Other Excess <br /> Lagged Effect Replacement Storage to Storage(free river) Credit Lease Replacement <br /> Losses On The River Obligation After Release Used Water <br /> and Diversion 1.3 <br /> Jan -4.03 -0.71 -4.74 93.57 0 -2.90 0.00 0.00 <br /> Feb -3.66 -0.63 -4.29 85.64 0 -2.32 0.00 0.00 <br /> Mar -3.83 -0.66 -4.49 77.41 0 -2.28 0.00 0.00 <br /> Apr -3.64 -0.61 -4.25 69.23 0 -1.68 0.00 0.00 <br /> May -3.73 -0.62 -4.35 69.56 0 7.69 0.00 0.00 <br /> Jun -3.65 -0.58 -4.23 77.06 0 16.09 0.00 0.00 <br /> Jul -3.86 -0.57 -4.43 94.95 0 27.35 0.00 0.00 <br /> Aug -3.99 -0.55 -4.54 101.56 0 16.31 0.00 0.00 <br /> Sep -3.96 -0.51 -4.47 95.37 0 1.86 0.00 0.00 <br /> Oct -4.13 -0.51 -4.64 84.12 0 -4.73 0.00 0.00 <br /> Nov -3.95 -0.47 -4.42 74.43 0 -4.14 0.00 0.00 <br /> Dec -3.99 -0.47 -4.46 65.74 0 -3.45 0.00 0.00 <br /> Total Study Period -46.42 -6.89 -53.31 47.81 0.00 0.00 <br /> (1)Equals Table 5 Column(11). (4)Equals Table 7a,Column(7)plus Column(5)plus Column(3),(5)and(6). <br /> (2)Balance of dewater depletion and recharge.Equals the net lagged (5)Water Commissioner approved free river diversion from Tri-Town Drainage or Godding <br /> dewatering water u 11-'n-i-- <br /> (6)Rural Ditch Credit used,1.3 shares of the 1.3 share on the north property. <br /> (3)Equals the sum of Columns(1)-(2). (7)Other lease. <br /> (8)Balance of remaining requirement. <br /> Civil Resources,LLC 11/1/2019 J:\Halllrwin-105\Water Resources\Gravel Pits Civil Resources\Shores SWSP-Civil Resources\2018 SWSP Renewal-shores\SWSPShores 2018.xls <br />