My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-12-19_INSPECTION - C1983059
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1983059
>
2019-12-19_INSPECTION - C1983059
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2024 11:16:22 AM
Creation date
12/20/2019 7:28:24 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1983059
IBM Index Class Name
Inspection
Doc Date
12/19/2019
Doc Name
Inspection Report
From
DRMS
To
Oxbow Mining, LLC
Inspection Date
12/17/2019
Email Name
LDS
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
December 17,2019 C-1983-059/Terror Creek Loadout LDS <br /> Inspection Topic Summary <br /> NOTE: Y=Inspected N=Not Inspected R=Comments Noted V=Violation Issued NA=Not Applicable <br /> N - Air Resource Protection N -Roads <br /> N - Availability of Records N -Reclamation Success <br /> N - Backfill& Grading N -Revegetation <br /> N - Excess Spoil and Dev. Waste N - Subsidence <br /> N -Explosives N - Slides and Other Damage <br /> N -Fish& Wildlife N - Support Facilities On-site <br /> N - Hydrologic Balance N - Signs and Markers <br /> R - Gen. Compliance With Mine Plan N - Support Facilities Not On-site <br /> N - Other N - Special Categories Of Mining <br /> N - Processing Waste N -Topsoil <br /> COMMENTS <br /> This was a partial inspection by Leigh Simmons of the Division of Reclamation,Mining and Safety <br /> (Division). The weather was cold,clear and dry. <br /> GENERAL MINE PLAN COMPLIANCE: <br /> Work had been in progress immediately before the inspection to demolish the bath house building. The <br /> building had been picked apart with an excavator and then placed into two large dumpsters. <br /> The railroad ties that had been stacked by Union Pacific adjacent to the railroad had been removed,but the <br /> piles of rock and ballast remained. <br /> DOCUMENTS RECEIVED <br /> N/A <br /> OTHER(SPECIFY) <br /> N/A <br /> ENFORCEMENT ACTIONS/COMPLIANCE <br /> No enforcement actions were initiated as a result of this inspection,nor are any pending. <br /> Number of Partial Inspection this Fiscal Year: 4 <br /> Number of Complete Inspections this Fiscal Year: 2 <br /> Page 2 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.