Laserfiche WebLink
December 17,2019 C-1983-059/Terror Creek Loadout LDS <br /> Inspection Topic Summary <br /> NOTE: Y=Inspected N=Not Inspected R=Comments Noted V=Violation Issued NA=Not Applicable <br /> N - Air Resource Protection N -Roads <br /> N - Availability of Records N -Reclamation Success <br /> N - Backfill& Grading N -Revegetation <br /> N - Excess Spoil and Dev. Waste N - Subsidence <br /> N -Explosives N - Slides and Other Damage <br /> N -Fish& Wildlife N - Support Facilities On-site <br /> N - Hydrologic Balance N - Signs and Markers <br /> R - Gen. Compliance With Mine Plan N - Support Facilities Not On-site <br /> N - Other N - Special Categories Of Mining <br /> N - Processing Waste N -Topsoil <br /> COMMENTS <br /> This was a partial inspection by Leigh Simmons of the Division of Reclamation,Mining and Safety <br /> (Division). The weather was cold,clear and dry. <br /> GENERAL MINE PLAN COMPLIANCE: <br /> Work had been in progress immediately before the inspection to demolish the bath house building. The <br /> building had been picked apart with an excavator and then placed into two large dumpsters. <br /> The railroad ties that had been stacked by Union Pacific adjacent to the railroad had been removed,but the <br /> piles of rock and ballast remained. <br /> DOCUMENTS RECEIVED <br /> N/A <br /> OTHER(SPECIFY) <br /> N/A <br /> ENFORCEMENT ACTIONS/COMPLIANCE <br /> No enforcement actions were initiated as a result of this inspection,nor are any pending. <br /> Number of Partial Inspection this Fiscal Year: 4 <br /> Number of Complete Inspections this Fiscal Year: 2 <br /> Page 2 of 4 <br />