My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-12-18_REVISION - C1981019 (13)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2019-12-18_REVISION - C1981019 (13)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 3:47:16 PM
Creation date
12/19/2019 6:59:22 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
12/18/2019
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Colowyo Coal Company
Type & Sequence
SL17
Email Name
ZTT
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. Performance of the reconstructed topography. Symptoms of failure or instabilities such as <br /> slumping or exposed highwalls were examined; <br /> 3. Hillslope design/function with regard to erosion; <br /> 4. Swales and depressions with regard to numbers of features and effect on post-mining land <br /> use; <br /> 5. Blending of regraded land to undisturbed areas; <br /> 6. The functioning of drainages with regard to knickpoints,blending at disturbance boundaries <br /> and channel erosion; <br /> 7. Erosional features; and <br /> 8. Drainage control for the reclaimed area, including upslope diversions. <br /> Colowyo AUSiR)1UUfW IIKQSUW U SU-KffUIQmFFRLSI�BkRule 2.05.4. Colowyo was <br /> granted a variance for contemporaneous reclamation for the East Pit, West Pit and the South <br /> Taylor Pit due to the nature of multi-seam mining. Backfilling and rough grading commenced <br /> once a steady-state condition was reached in each of the pits. <br /> The approved backfilling and grading plan for the Colowyo Mine is found in Volume 1 (East and <br /> West Pit), Volume 12 (South Taylor), and Volume 15 (Collom) of the PAP. Maps 19, 19A and <br /> 19B show the approved post-mining topography, Maps 29 and 29A, and 29B show the <br /> backfilling and grading schedule. The pre-mining and post-mining cross-sections are shown on <br /> Maps 20, 20A and 20B, and the permanent drainage channel profiles are shown on Maps 33, <br /> 33A, 33B, and 33C. Map 1 of the SL-17 application show cross-section area for the 0.4 acres <br /> being requested of the South Collection Ditch, including approved post-mining topography <br /> alongside the constructed topography. <br /> The approved drainage reestablishment consisted of the design and construction of permanent post <br /> mining drainage channels. The post-mine channel locations are shown on Maps 41, 4 1 A and 4 1 B <br /> of the Colowyo PAP. The South Collection Ditch construction designs can be found in Exhibit 7 of <br /> the Colowyo PAP. <br /> Phase II Bond Release <br /> Proposed Decision and Findings of Compliance December 18,2019 <br /> Partial Phase I,II and III Bond Release SL-17 Page 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.