Laserfiche WebLink
CC&V MINING <br /> IRON CLAD BUILDING,H.D.TRANS 10 TA, 3 <br /> ACUREN FORMAL EXTERNAL INSPECTION 6-2011 <br /> Item Status Comments <br /> 1.0 Tank Containment <br /> 1.1 Containment structure in <br /> satisfactory condition? ❑ X Yes ❑ No* <br /> 1.2 Drainage pipestvalves fit for <br /> continued service ❑Yes ❑ No* X N/A TANK IS INSIDE OF BUILDING. <br /> 2.0 Tank Foundation and Supparts <br /> 2.1 Evidence of tank settlement <br /> or foundation washout? ❑Yes ❑X No* <br /> 2.2 Cracking or spalling of <br /> concrete pad or ring wall? uYes u X No* N/A <br /> 2.3 Tank supports in satisfactory <br /> condition? ❑X Yes ❑ No* N/A <br /> 2.4 Water able to drain away from <br /> tank? ❑ X Yes ❑ No* <br /> 2.5 Grounding strap secured and <br /> in ooDd condition? uYes ❑ No* X NJA. <br /> 3.0 Cathodic Protection <br /> 3.1 CP system functional? ❑Yes ❑ No* X NJA <br /> 3.2 Rectifier Reading: ❑Yes ❑ No* X N/A <br /> 4.0 Tank External Coating <br /> 4.1 Evidence of paint failure? ❑ Yes ❑X No* <br /> 5.0 Tank Shell/Heads <br /> 5A Noticeable shell/head <br /> distortions, buckling,denting or ❑ Yes ❑X No* <br /> 5.2 Evidence of shell/head <br /> corrosion or cracking? ❑Yes ❑ X No* <br /> 6.0 Tank Manwa s PiRinp and Equipment within Secondary Containment <br /> 6.1 Flanged connection bolIS tg t <br /> and fully engaged with no sign of <br /> wear or oorrosion? ❑ X Yes ❑ No* <br /> 7.0 Tank Roof <br /> 7.1 Standing water on roof? ❑ Yes ❑X No* <br /> 7.2 Evidence of coating cracking, <br /> crazing,peeling, blistering? ❑ Yes ❑X No* <br /> 7.3 Moles in roof? ❑Yes ❑ X No* <br />