Laserfiche WebLink
Spill .. Control, • <br /> CountermeasuresNEWMONT •r the Cresson Project <br /> .• Relations <br /> 4.5.5 Tank Integrity Testing <br /> Tank integrity testing will be performed according to the plan provided in Appendix G and the requirements <br /> summarized in Section 3.5.4. <br /> 4.5.6 Security <br /> In addition to the security measures in place for the entire CC&V facility, as described in Section 3.3,there is <br /> additional security for the ADR-1,which is surrounded by a fence, well lit during night hours, and is manned 24/7. <br /> ------ --- -------- -- ----_ ---. _--- --- --- - _ - ------ ------- ---- -- ----- -- <br /> Department THIS DOCUMENT IS UNCONTROLLED IN HARDCOPY FORMAT Doc Id:NA CCV-SER PLAN- <br /> 1930 <br />