Laserfiche WebLink
Spill • . <br /> CountermeasuresNEWMONT •r the Cresson Project <br /> SUstainability & ExternalRelations <br /> Any spills will be contained inside of the ADR-1 building itself, or within the VLF-1 lined system. <br /> Delivery trucks are staged on a concrete pad west of the plant.This unloading and storage area are protected by <br /> bollards to prevent accidental collisions between trucks and storage tanks. Mixing of chemicals takes place either <br /> inside the ADR-1 plant or within the tanks located outside the building on the west and north sides. <br /> Storage of non-regulated chemicals and reagents in the quantities shown in Table 6b are within the chemical <br /> storage area, within operating systems, and within pipes, pumps, and other appurtenances as further described <br /> below: <br /> Sodium Hydroxide(NaOH)- NaOH liquid is stored directly west of the ADR-1 in a 20,000-gallon tank within <br /> concrete secondary containment and within the tertiary containment of the lined area of the VLF-1.The concrete <br /> containment sump is equipped with a float-activated pump that would return fluid to the plant circuit in the event <br /> of a release.A release outside the concrete containment would remain on the VLF-1 liner and migrate north <br /> toward the main liner system. <br /> Hydrochloric Acid(HCL)-HCI liquid is stored directly west of the ADR-1 in an 8,200-gallon,double-walled tank <br /> within concrete containment and within the lined area. Releases outside the tank containment would flow north, <br /> completely contained within the liner. <br /> Antiscalant-Antiscalant liquid is not a hazardous chemical. It is stored in various locations at the ADR-1 Plant in <br /> poly-plastic 600 to 8,000 gallon capacity single-walled,foam-insulated tanks.The ADR-1 is located on liner that <br /> drains to the VLF-1.Antiscalant is also stored within the VLF-1 in poly plastic insulated tanks various sizes(see <br /> Table 6b for container sizes). <br /> Release of Antiscalant should be controlled, even though the residue is not hazardous.Complete removal of <br /> impacted soils is not required. Contaminated soils may be placed on the VLF-1 if desired. <br /> 4.5.3.2 Process Reagents at the ADR-1 Plant and VLF-1 <br /> The ADR-1 Plant uses process(minerals beneficiation) reagents to recover precious metals from the ore.The <br /> location of the ADR-1 Plant is identified on Figures 2 and 6.Specific details for the ADR-1 facility can be found in <br /> Table 6a and Table 6b. Diluted cyanide leach solution (typically 0.01%to 0.02%or 100—200 ppm) is directed to <br /> and from the VLF-1 through an HDPE/steel piping system. Pregnant lines are steel and barren lines are steel/HDPE <br /> depending on location. <br /> 4.5.3.3 Spill Prevention for Process Reagents <br /> VLF-1—Dilute cyanide leach solution (typically 0.01%to 0.02%or 100—200 ppm) is directed to and from the VLF-1 <br /> through an HDPE/steel piping system. Pregnant lines are steel and barren lines are steel/HDPE.The pipelines are <br /> also equipped with an automatic shut-off,triggered by flow or pressure differentials. In the unlikely event that <br /> solution drains or sprays off liner,spill response procedures described in Section 5.0 of this Plan should be <br /> followed expeditiously. Pipes, drip lines,and conveyances that direct cyanide solution to and from the VLF-1 are <br /> generally installed 15 feet between the conveyance and the edge of the liner. CC&V may also affix pieces of <br /> synthetic liner on the side of flanges and valves facing the edge of the liner to reduce the chance of off-pad <br /> spraying should a leak develop. <br /> Bulk Cyanide Delivery,Storage,and Handling-The facilities for mixing, unloading, and storage of cyanide are <br /> located within the security perimeter of the mine, physically distant(2-5 miles)from any dwellings or <br /> communities.CC&V is supplied with liquid cyanide which is off-loaded cyanide to CC&V's solution storage tank. <br /> The storage tanks are both fitted with audible high-level alarms,and tank levels are monitored remotely by <br /> process operators in the ADR-1 control room. <br /> During cyanide delivery,trucks are staged on a concreted pad sloped to a sump within the containment for the <br /> stationary storage tanks.The cyanide storage tanks are located within a dedicated concrete impoundment;the <br /> - _ ------p.. - - .. _.w__. -------- _-- ---- ----- -------- _ ---- _ _-.. ---------- <br /> Department THIS DOCUMENT IS UNCONTROLLED IN HARDCOPY FORMAT Doc Id:NA CCV-SER-PLAN- <br /> 1930 <br /> ------ ------- -.._._._--_- -- ---- _. -- ------ --------- -------- ------- ------- - ---- --------- ----------.. .-------.---, <br />