My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-12-13_REVISION - M1980244 (60)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2019-12-13_REVISION - M1980244 (60)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2025 2:33:04 AM
Creation date
12/17/2019 8:34:53 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
12/13/2019
Doc Name Note
Appendix 10 - 11
Doc Name
Request For Amendment To Permit
From
CC&V
To
DRMS
Type & Sequence
AM13
Email Name
TC1
MAC
BFB
ERR
JPL
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ResponseSpill Control, • <br /> CountermeasuresNEWMONT •r the Cresson Project <br /> NORTH <br /> .• Relations <br /> 4.4.4 Spill Response Procedures <br /> Section 5.0 provides the general spill response procedures for use at the Crusher Storage Area.The following <br /> narrative provides additional detail on spill clean-up. <br /> 4.4.5 Tank Integrity Testing <br /> Tank integrity testing will be performed according to the plan provided in Appendix G and the requirements <br /> summarized in Section 3.5.4. <br /> 4.4.6 Lime/Lime Silo <br /> Coarse(pebble) lime is used to prepare crushed Cresson Project ore for leaching.The pebble lime silo for the <br /> Cresson Project is located along the conveyor downstream of the secondary crusher. <br /> The silos are equipped with a bag-house to control lime dust. Lime is applied in a covered portion of the conveyor <br /> to enhance control of fugitive dust.Accumulation of lime at the base of the silos may occur during transfer from <br /> the bulk tankers. <br /> A release of lime will be removed using a front-end loader or equivalent equipment.The material retrieved will <br /> either be placed on the VLF-1 or incorporated into an overburden storage area. Lime will be distributed onto the <br /> pad surface only when the ambient winds are light and only when the lime will be rapidly mixed into the ore or <br /> overburden so as to avoid wind erosion. <br /> ------ ------ -- - - ---- _r._._ ---- -- ------ ------ <br /> Department THIS DOCUMENT IS UNCONTROLLED IN HARDCOPY FORMAT Doc Id:NA-CCV-SER-PLAN- <br /> 1930 <br />
The URL can be used to link to this page
Your browser does not support the video tag.