Laserfiche WebLink
ResponseSpill Control, • <br /> CountermeasuresNEWMONT •r the Cresson Project <br /> NORTH <br /> .• Relations <br /> 4.4.4 Spill Response Procedures <br /> Section 5.0 provides the general spill response procedures for use at the Crusher Storage Area.The following <br /> narrative provides additional detail on spill clean-up. <br /> 4.4.5 Tank Integrity Testing <br /> Tank integrity testing will be performed according to the plan provided in Appendix G and the requirements <br /> summarized in Section 3.5.4. <br /> 4.4.6 Lime/Lime Silo <br /> Coarse(pebble) lime is used to prepare crushed Cresson Project ore for leaching.The pebble lime silo for the <br /> Cresson Project is located along the conveyor downstream of the secondary crusher. <br /> The silos are equipped with a bag-house to control lime dust. Lime is applied in a covered portion of the conveyor <br /> to enhance control of fugitive dust.Accumulation of lime at the base of the silos may occur during transfer from <br /> the bulk tankers. <br /> A release of lime will be removed using a front-end loader or equivalent equipment.The material retrieved will <br /> either be placed on the VLF-1 or incorporated into an overburden storage area. Lime will be distributed onto the <br /> pad surface only when the ambient winds are light and only when the lime will be rapidly mixed into the ore or <br /> overburden so as to avoid wind erosion. <br /> ------ ------ -- - - ---- _r._._ ---- -- ------ ------ <br /> Department THIS DOCUMENT IS UNCONTROLLED IN HARDCOPY FORMAT Doc Id:NA-CCV-SER-PLAN- <br /> 1930 <br />