Laserfiche WebLink
ResponseSpill <br /> NEWMONT Countermeasures Plan for the Cresson Project <br /> - <br /> .. <br /> The majority of the used oil is burned in oil-fired boilers that provide heat to the NTS. Off-site disposal of used oil <br /> occurs on very irregular basis when there is a surplus of used oil. Prior to these transfers of used oil,tank readings <br /> will be obtained from the storage tank to estimate the volume of used oil remaining in the tank.Any transfers of <br /> used oil from the storage tank to a transporter's truck will be continually attended by the transporter to monitor <br /> for leaks and/or spillage.A spill of antifreeze will be managed separately from used oil and will be placed in a <br /> container labeled "used antifreeze." <br /> 4.2.4 Spill Response Procedures <br /> Section 5.0 provides the general spill response procedures for use at the Ironclad Facility and NTS. <br /> 4.2.5 Tank Integrity Testing <br /> Tank integrity testing will be performed according to the plan provided in Appendix G and the requirements <br /> summarized in Section 3.5.4. <br /> -------------------------------------------------------------------------------------------------------------------------------------------------------------- ----- <br /> Department THIS DOCUMENT IS UNCONTROLLED IN HARDCOPY FORMAT Doc Id:NA-CCV-SER-PLAN- <br /> 1930 <br />