My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-12-13_REVISION - M1980244 (60)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2019-12-13_REVISION - M1980244 (60)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2025 2:33:04 AM
Creation date
12/17/2019 8:34:53 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
12/13/2019
Doc Name Note
Appendix 10 - 11
Doc Name
Request For Amendment To Permit
From
CC&V
To
DRMS
Type & Sequence
AM13
Email Name
TC1
MAC
BFB
ERR
JPL
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SPILL RESPONSE PLAN <br /> and <br /> SPILL PREVENTION,CONTROL, AND COUNTERMEASURES PLAN <br /> for the <br /> CRESSON PROJECT <br /> Cripple Creek & Victor Gold Mining Company (Cresson Project) <br /> 1280 Highway 67 <br /> Carlton Security (719)689-4220—24 hrs <br /> LOCATION COORDINATES: <br /> Legal Location: (Township, Range, Section, '/<Section): T15S, R69W,Sec31,NW1/4 <br /> Latitude and Longitude: Security Office-38°43'37"N&105109'27"W <br /> Administration (719)689-4255 <br /> 100 North Third Street(PO Box 191)Victor, Colorado 80860 <br /> SPILL RESPONSE GUIDELINES <br /> FIRST LEVEL RESPONDERS (any Team Member knowledgeable of the safe handling of the spilled <br /> substance) <br /> 1. Safety is the first consideration when responding to a spill.Human life or health mustnot bejeopardized. <br /> Be sure the site of the spill/accidentis safe before proceeding.Treatmentof life threatening injuries takes <br /> precedence. <br /> 2. Use common sense. <br /> 3. Notify another Team Member,and call for help if needed. <br /> 4. Stop spill at source(if this can be done safely). <br /> 5. Stop spread of spill(if this can be done safely). <br /> 6. Report incident to supervisoras soon as reasonably possible. <br /> 7. Recover spilled material and place in a contained area ortreat to neutralize material. <br /> 8. Complete Internal Spill Report, after incident is managed.((CC&V Prospector—Cintellate Report) <br /> SECOND LEVEL RESPONDERS (Another Team Member or Supervisor) <br /> 1. Provide first level responderswith everything they need to safely and effectively respond tothe spill. <br /> 2. Inform Sustainabilityand External Relations(S&ER)Department(719-689-4300)so that proper <br /> external notifications can be made per regulations. <br /> 3. Notify Health Safety, and Security Department. <br /> S&ER RESPONSE <br /> 1. VyerihLfield procedures are properlyfol lowed. <br /> 2. Determine information and notification requirements. <br /> 3. Notify General Manager, if external notifications are required. <br /> 4. Notify appropriate external entities within regulatory tim efram e.Record details of who was informed of what <br /> and when,in accordance with the notifications. <br /> 5. Follow-up with an inspection ofthe site.Sample as necessary.Complete documentation. <br /> 6. Review incidentand implement remedial measures if needed. <br /> OFF-SITE SPILL RESPONSE POLICY <br /> Due to liabilityconcerns,it is CC&Vs policy not to respond to spills caused byother entities,including <br /> transporters,unless: <br /> 1. The spill is within the Cresson Project Area;or <br /> 2. CC&V has been requested to do so by the responsible partyor the local emergency response team AND <br /> 3. A response is specificallyauthorized by the CC&V General Manager or his designee. <br /> See "Vendor Contacts" tab located in the Emergency Response Procedures for telephone numbers of <br /> vendors that transport bulk materials to and from the Cresson Project. <br /> BE SAFE-NOTIFY-MITIGATE-REPORT -REVIEW -IMPROVE <br /> SAFETY AND SECURITY RADIO CALL NUMBERS: "BASE-1... "R-1,""R-2" <br /> S&ER RADIO CALL NUMBERS: "E-0," "E-1,""E-2," or"E-3" <br />
The URL can be used to link to this page
Your browser does not support the video tag.