My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-12-13_REVISION - M1980244 (62)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2019-12-13_REVISION - M1980244 (62)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2025 2:23:12 AM
Creation date
12/17/2019 8:32:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
12/13/2019
Doc Name Note
Appendix 9
Doc Name
Request For Amendment To Permit
From
CC&V
To
DRMS
Type & Sequence
AM13
Email Name
TC1
MAC
BFB
ERR
JPL
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
V design was submitted in 2008 by Smith William Consultants, Inc. This total report has 774 <br /> pages and includes evaluations of the geology, foundation engineering, filling of old <br /> underground workings, sampling and testing of materials, detailed designs for the slope stability, <br /> the liner system, pregnant solution storage area PSSA, the underdrain system, surface water <br /> hydrology and the final reclamation plans. <br /> Important information regarding the design parameters are given below, which have been <br /> extracted from the 2008 Phase V design done by Smith Williams Consultants, Inc.: <br /> 1.3 Design Criteria <br /> Smith Williams completed the engineering design for Phase 5 VLF using the following desist <br /> criteria: <br /> 1.3.1 Valley Leach Facility(VLF) <br /> Parameter Value <br /> Maximum are depth over liner 800 feet(Phase I through Phase IV) <br /> 590 feet(Phase 5) <br /> Nominal ore angle of repose slope 1.31-11:1V <br /> overall operational ore side slope against upsloping ground 1.61-11:1V <br /> Overall operational ore side slope against downsloping ground 2.5HAV <br /> Overall operational ore side slope above Phase 5 VLF PSSA embankment 2.0HAV <br /> Maximum lift height 100feet <br /> 1.3.3 Cresson Ore <br /> Parameter Value <br /> Average ore dry density 110 pcf <br /> wet are density(at field capacity moisture content) 118 pcf <br /> 1.3.4 Water Balance <br /> Anticipated Ore Production Rate Schedule <br /> (million tons/year) <br /> Year Phase I Phase IIAII Phase IV Phase 5 <br /> 2011 4.7 Mt 6.9 Mt 8.8 Mt 3.0 Mt <br /> 2012 3.4 Mt 0.5 Mt 0.5 Mt 20.4 Mt <br /> 2013 4.6 Mt -- 1.5 Mt 2.1 Mt 13.1 MI <br /> 2014 6 0 Mt 0.5 Mt 0.5 Mt 18.1 Mt <br /> 2015 5.2 Mt 0.5 Mt D 5 Mt 17.4 Mt <br /> 2016 5.7 Mt NIA NIA 15.6 Mt <br /> Notes: <br /> 1. Phase 5 will not begin solution application until 2011 and the approved Amendment No.8 water balance <br /> remains in effect until that time. <br /> 2. Annual ore production schedule subject to change. <br /> 34 <br />
The URL can be used to link to this page
Your browser does not support the video tag.