Laserfiche WebLink
NewFields <br /> Newmont <br /> VLF/OSA Closure Study <br /> Schist Island/Phase 3 Stormwater Diversion Channel <br /> 500yr Hec-HMS Results <br /> Peak Discharge volume(acre- <br /> Hydraulic Element Drainage Area(MiZ) (ft3/s) ft) <br /> OUTLET 2 0.088 199.601 12.2 <br /> OUTLET 3 0.3235 613.409 44.9 <br /> SGOSA CHANNEL 1 0.1346 301.227 18.7 <br /> SGOSA CHANNEL 2 0.2486 445.685 34.5 <br /> SCHIST NORTH 0.0567 131.261 7.9 <br /> SCHIST SOUTH 0.0272 61.596 3.8 <br /> SCHIST WEST 0.0313 68.341 4.3 <br /> SGOSA NORTH 0.1346 314.845 18.7 <br /> STACK NORTH 0.114 195.507 15.8 <br /> STACK NORTHWEST 0.0477 1 106.128 1 6.6 <br /> Sta 42+00 0.1346 314.845 18.7 <br /> Sta 52+00 0.2486 461.488 34.5 <br /> Structure Contributing Design Storm Peak Flow <br /> Subbasin/Elements Event (ft3/s) <br /> Channel 1 SCHIST NORTH 100yr,24hr 131.261 <br /> Channel 2 SCHIST WEST 100yr,24hr 68.341 <br /> Channel 3 SCHIST SOUTH 100yr,24hr 61.596 <br /> Channel 4 STACK NORTHWEST 100yr,24hr 106.128 <br /> SGOSA1 0+00 TO 52+00 SGOSA NORTH 100yr, 24hr 314.845 <br /> SGOSA1 52+00 TO 60+00 SGOSA NORTH,STACK 100yr, 24hr 461.488 <br /> NORTH <br />