Laserfiche WebLink
NewFietds CALCULATION COVER SHEET <br /> Client Newmont Preparer: <br /> Project VLF/OSA Closure Study Checked: <br /> Title ECOSA Stormwater Management Revision A <br /> CALCULATION OBJECTIVE <br /> 1. Estimate the peak runoff from upstream watersheds to design the stormwater diversion channels <br /> ASSUMPTIONS <br /> 1.SCS curve number of 71 based on Amendment 11 to the Cresson Project,vol. IV p.79 <br /> 2. 100yr, 24hr storm event of 4.1" <br /> 3. 500YR, 24hr storm event of 6.3" <br /> METHODOLOGY <br /> 1.Area and length measurements were determined using AutoCAD Civil 3D. <br /> 2.SCS Type II Storm event was modeled. <br /> 3. HEC-HMS was used to model the storm events <br /> REFERENCES <br /> 1.AutoCAD Civil 3D version 2018. <br /> 2. United States Department of Agriculture Natural Resources Conservation Service(NRCS). (1986). "Urban <br /> Hydrology for Small Watersheds,Technical Release 55 Second Edition,"June <br /> 3. U.S. Department of Agriculture(USDA), Natural Resources Conservation Service(NRCS). "Part 630 Hydrology <br /> National Engineering Handbook." 210-vi, NEH, May 2010. <br /> 4. United Stated Department of Commerce, National Oceanic and Atmospheric Administration. (reprinted 1984). <br /> "Hydrometeorological Report No.49, Probably Maximum Precipitation Estimates,Colorado River and Great Basin <br /> Drainages," (HRM 49) <br /> 5. United States Army Corps of Engineers. Hydrologic Modeling System (HEC-HMS)Version 3.5,Computer Program <br /> (August 2010) <br /> 6. Newmont"Cresson Project Amendment 11," December 2015 <br /> CONCLUSIONS <br /> n/a <br /> Filename <br /> P\Projects\0106 035 Closure Stormwater\H-CALCULATIONS\Pen meter Channels\[2019.04.02-ECOSA Hydrology Overview xlsx]Hec Calc Cover <br />