My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-12-13_REVISION - M1980244 (55)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2019-12-13_REVISION - M1980244 (55)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2025 2:02:33 AM
Creation date
12/16/2019 2:38:11 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
12/13/2019
Doc Name Note
Appendix 3
Doc Name
Request For Amendment To Permit
From
CC&V
To
DRMS
Type & Sequence
AM13
Email Name
TC1
MAC
BFB
ERR
JPL
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STORMWATER MANAGEMENT PLAN <br /> CRIPPLE CREEK AND VICTOR GOLD MINING COMPANY <br /> 7.0 SWMP Modifications <br /> The SWMP is intended to be a "living" document that is kept up-to-date to reflect the changing conditions <br /> at the site The SWMP Administrator shall maintain a master hard copy of the SWMP. Field design changes <br /> and other changes to the stormwater management system or site conditions will be documented in red-line <br /> on the master digital copy during each quarterly site stormwater inspections and documented on the <br /> Revisions Table (Table 4) below. <br /> The SWMP Administrator shall provide photo copies of all pages with red-line revisions to relevant Mine <br /> Operations, Processing, and Maintenance personnel upon completion of each quarterly inspection. Red- <br /> line revised sheets shall be attached behind the Revisions Table below <br /> No less than annually, or at such time that a field revision or cumulative field revisions become significant <br /> in the judgement of the SWMP Administrator, the SWMP shall be updated to include all previous and <br /> necessary revisions. The updated SWMP shall be document controlled, new hard copies distributed to <br /> relevant departments and employees, and old hard copies destroyed. <br /> Table 3 summarizes previous updates to the Site SWMP. <br /> Table 3. Summary of SWMP Updates <br /> Update No. Date Author Description of Modifications <br /> 01 June 16, 2005 TCC Initial release of document <br /> 02 July 29, 2010 MDE Plan Update <br /> 03 November Steffens/ Ellis Plan Updated for MLE2 <br /> 2013 <br /> 04 July 2014 MDE Minor typos corrected, stormwater team <br /> members changed, footers revised <br /> 05 January 2015 Steffens/ Ellis Major updates to maps, text, inspection <br /> sheets <br /> 06 January 2018 Golder Associates Major rewrite of text, maps, and inspection <br /> forms. <br /> BMPs renamed to "Sumps"; <br /> 07 January 2019 JMR Minor text rewrites and updates, inspection <br /> sheet updates. <br />
The URL can be used to link to this page
Your browser does not support the video tag.