Laserfiche WebLink
Revision <br /> GOLDCORP. <br /> TR Description Status <br /> 1 Unknown <br /> 2 Unknown <br /> 3 Unknown <br /> 4 Unknown <br /> 5 jUnknown <br /> 6 Unknown <br /> 7 CARLTON PROJECT PN M-80-244 RECEIPT OF 112 RECLAMATION PERMIT TR REQUEST TR-007 <br /> 8 CHANGE IN TECHNICAL SPECIFICATION COLD WEATHER SEAMING OF GEOMEMBRANE & CESSATION & RESUMPTION OF <br /> 9 CRESSON PROJECT PN M-80-244 REQUEST TO REVISE SOURCE ROCK FOR DRAIN COVER FILL MATERIAL PLACED OVER <br /> 10 CRESSON PROJECT PN M-80-244 REQUEST FOR TR SUBMISSION OF GROUND WATER DATA INSTALLATION & SAMPLING <br /> 11 CRESSON PROJECT PN M-80-244 TRANSMISSION OF FINAL GEOLOGIC LOG OF NEW WATER WELL <br /> 12 CRESSON PROJECT PN M-80-244 SPECIFICATION CHANGE FOR SELECT DRAIN COVER FILL & CONDITION ON OMLR <br /> 13 CRESSON PROJECT PN M-80-244 SUBMISSION OF TR ADDRESSING FINAL RECLAMATION OF AREQUA GULCH <br /> 14 MINE SITE USE OF DETOXIFIED LEACH PAD MATERIALS PAD 1 & PAD 2 FROM CRIPPLE CREEK &VICTOR GOLD MINE <br /> 15 11995 CONSTRUCTION OF CRESSON VALLEY LEACH FACILITY CRIPPLE CREEK & VICTOR GOLD MINING CO PN M-80-244 <br /> 16 CRESSON PROJECT PN M-80-244 SUBMISSION OFTR ADDRESSING FINAL RECLAMATION OF AREQUA GULCH OVERBURDEN <br /> 17 CRESSON MINE TECHNICAL SPEC REVISION CARLTON TAILINGS LIFT THICKNESS ELIMINATION PN M-80-244 <br /> 18 CRESSON MINE TECHNICAL SPEC REVISION CARLTON TAILINGS LIFT THICKNESS INCREASE PN M-80-244 <br /> 19 CRESSON PROJECT PN M-80-244 ENHANCEMENT THROUGH MINOR MODIFICATIONS OF PHASE II UNDERDRAIN <br /> 20 ICRESSON PROJECT PN M-80-244 DELINEATION OF BORROW AREA FOR PHASE II EARTH WORKS CONSTRUCTION <br /> 21 CRESSON PROJECT PN M-80-244 MODIFICATION OF OVERLAP OF GEOMEMBRANE OVER UNDERDRAIN <br /> 22 CARLTON PROJECT-PN M-80-244-AMENDMENT 6 TEMPORARY CONDITIONS TO SET TRIGGER PARAMETERS FOR PH WAD <br /> 23 CRESSON PROJECT PN M-80-244 PROCEDURES AND MATERIALS FOR 1996 CONSTRUCTION TEMPORARY DEFERRAL OF RET <br /> 24 CRESSON PROJECT PN M-80-244 PROCEDURES AND MATERIALS FOR 1996 CONSTRUCTION LENER LOAD AND INTERFACE <br /> 25 ICRIPPLE CREEK & VICTOR GOLD CO EXPANDED AREA FOR SOIL LINER FILL SUBMISSION OF SPECIFICATIONS &TEST <br /> 26 BENTONITE ADDITIONAL TO SOIL LINER FILL STABILITY ANALYSIS FILE & PROCEDURES & MATERIALS FOR 1996 CO <br /> 27 CRESSON PROJECT PN M-80-244 BENTONITE ADDITION TO SOIL LINER FILL AREA OF PHASE II CONSTRUCTION FOR <br /> 28 CRESSON PROJECT PN M-80-244 SUBMISSION OF CATION EXCHANGE TEST INFORMATION FOR AREA 2 SOIL LINER FIL <br /> 29 CRESSON PROJECT PN M-80-244 TIMING OF PLACEMENT OF DRAIN COVER FILL ON LLDPE SYNTHETIC LINER <br /> 30 ICRESSON PROJECT PN M-80-244 SURFACE WATER DRAINAGE MODIFICATIONS FOR AREQUA GULCH <br /> 31 CRESSON PROJECT PN M-80-244 TR FOR EXPANSION OF PHASE II OF CRESSON PROJECT VALLEY LEACH FACILITY <br /> 32 CRESSON PROJECT PN M-80-244 STATUS OF LOW VOLUME SOLUTION COLLECTION SYSTEM FOR PHASE II OF CRESSON <br /> 33 CRESSON PROJECT PN M-80-244 TR FOR MINOR STRAIGHTENING & RAISING OF IRONCLAD HAUL ROAD INCREASE IN S <br /> 34 MEMO REVIEW OF NEW SEISMOGENIC ANALYSIS OF CRIPPLE CREEK & VICTOR GOLD MINING CO CRESSEN PROJECT <br /> 35 CRESSON PROJECT PN M-80-244 TR FOR MINOR INCREASE IN ELEVATION OF VALLEY LEACH FACILITY PHASE II TOE <br /> 36 CRESSON PROJECT PN M-80-244 TR FOR RELOCATION PORTION OF AREQUA GULCH GOLD RUN DIVERSION CHANNEL <br /> 37 CRESSON PROJECT PN M-80-244 TR FOR AN ADDITION TO THE ADR BUILDING INSTALLATION OF ADDITIONAL TANKS <br /> 38 CRESSON PROJECT PN M-80-244 TR FOR FUTURE BACKFILLING OF SURFACE MINES <br /> 39 CRESSON PROJECT PN M-80-244 TR FOR RECLAMATION COST ESTIMATE FOR REMOVAL OF WATER LINES <br /> 40 Addition to ADR 1 Building, Installation of Carbon Columns and Associated Additional Tanks, Replacement of the Carbon <br /> Regeneration Kiln and Installation of a Cyanide Delivery and Mix System <br /> 41 DMG Liner <br /> 42 Crusher Yard Drainage <br /> 43 East Cresson Mine Extension <br /> 44 VLF Boundary <br /> 45 VLF Ore Capacity Recalculation <br /> 46 VLF Enhancements & E Cresson Backfill Increase <br /> 47 VLF Solution Enhancement &Topsoil Stockpile Locations <br /> 48 PH IV Isolation & Decomission Victor Pads <br /> 49 Ironclad Engr Dry Bldg <br /> 50 Little E Train <br /> 51 CT Sed Pond <br /> 52 Phase IV b c Perimeter Liner Extension 1008 <br /> 53 North Cresson Re-Grading 12_08 <br /> 54 Main Cresson Noise & Visual Berm 109 <br /> 55 Revised Backfill Plan &Temp Access Rd <br /> 56 ADR Waterline Ph 5 Closure Drain <br /> 57 Process Fluid Injection Program Hydro-Jex <br /> 58 E-Train & Phase I Auxillary Caisson <br /> 59 j New LOB &Triangle Liner <br /> 60 Phl Pump 299 Caisson <br /> 61 Moving TS Pile No. 27 <br /> 62 Ph 4c Berm Raise and LOB Liner <br /> 63 New Fuel Island <br /> 64 PSE Liner <br /> 65 PH5 Berm Raise and Mil Pltfrm Spec Chg <br /> 66 PSES-Lab Liner-Noise Berm <br /> 67 Parts and Lubrication Storage Buildings <br /> 68 Extended PSE Liner Sys. Construction <br /> 69 Squaw Mt. Radio Tower& access rd <br /> 70 SADR Relocation <br /> 71 Crusher Powerline <br /> 72 Spent Ore Relocation <br /> Cripple Creek and Victor Gold Mining Company <br /> Amendment 13 APPENDIX 2 <br />