Laserfiche WebLink
AERC CC&V water Balance user's Manual <br /> November 2019 <br /> results, NewFields has designed the Phase 3 PSSA to maintain a minimum of five feet of freeboard above <br /> the maximum water volume anticipated to ever be present. <br /> References <br /> Ecological Resource Consultants, Inc. (ERC). 09-24-19 CCV WB Model.gsm. Goldsim File. September 2019. <br /> Ecological Resource Consultants, Inc. (ERC). Cripple Creek & Victor Water Balance. Technical <br /> Memorandum. Produced for NewFields. November 2015. <br /> Goldsim Technology Group LLC. Goldsim, Version 12.1, [Software], 2018. <br /> 12 <br />