My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-12-13_REVISION - M1980244 (58)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2019-12-13_REVISION - M1980244 (58)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2025 8:08:29 AM
Creation date
12/16/2019 1:10:51 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
12/13/2019
Doc Name Note
Appendix 1
Doc Name
Request For Amendment To Permit
From
CC&V
To
DRMS
Type & Sequence
AM13
Email Name
TC1
MAC
BFB
ERR
JPL
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
172
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Newmont Goldcorp-Cripple Creek&Victor Gold Mine <br /> Technical Specification No.01400 EARTHWORK CQA ■ <br /> VLF2 Phase 3 <br /> Project No.475.0106.033 <br /> December 5,2019 <br /> 7.1. Daily Record Keeping <br /> Daily records kept by the CQA MONITOR shall consist of field notes, observation and testing <br /> data sheets, summary of the daily meeting with CONTRACTOR, and reporting of construction <br /> problems and resolutions. The CQA MONITOR shall submit this information on a regular basis <br /> to MANAGER for review. <br /> 7.2. Soils Observation and Testing Forms <br /> The CQA MONITOR will document soils observations on forms that generally include the <br /> following information: <br /> ■ date, project name, location, and weather data, including high and low daily temperatures; <br /> ■ a site plan showing work areas and test locations; <br /> ■ descriptions of ongoing construction detailing work areas and equipment utilized by <br /> CONTRACTOR; <br /> ■ summary of test results and samples obtained, with locations and elevations; <br /> ■ resolutions of deficient test results; <br /> ■ test equipment calibrations, if necessary; <br /> ■ summary of meetings held; and <br /> ■ signature or initials of the CQA MONITOR. <br /> 7.3. Photo Documentation <br /> The CQA MONITOR shall photograph all phases of construction. Photographs shall be identified <br /> by location, time, date, and name of the CQA MONITOR taking the photograph. <br /> 7.4. Design and Specification Changes <br /> During construction, the need to address DESIGN and SPECIFICATION changes, modifications, or <br /> clarifications may arise. In such cases the CQA MONITOR shall notify MANAGER, which shall <br /> notify the DESIGN ENGINEER and the CERTIFYING ENGINEER. DESIGN and SPECIFICATION <br /> changes shall only be made with written agreement from MANAGER and DESIGN ENGINEER. <br /> 7.5. Weekly Progress Reports <br /> The CQA MONITOR shall prepare weekly progress reports summarizing all construction and <br /> quality assurance activities. This report shall be submitted to MANAGER and shall include the <br /> following information: <br /> ■ date, project name, and location; <br /> Page 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.