My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-12-13_REVISION - M1980244 (58)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2019-12-13_REVISION - M1980244 (58)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2025 8:08:29 AM
Creation date
12/16/2019 1:10:51 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
12/13/2019
Doc Name Note
Appendix 1
Doc Name
Request For Amendment To Permit
From
CC&V
To
DRMS
Type & Sequence
AM13
Email Name
TC1
MAC
BFB
ERR
JPL
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
172
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Y`F.NewFields1E CALCULATION COVER SHEET <br /> Client Newmont Preparers JEP 10/31/19 <br /> Project Squaw Gulch VLF2 Phase 3 Checked: JNM 10/31/19 <br /> Title Sizing Revision A <br /> CALCULATION OBJECTIVE <br /> 1. Design high volume solution collection piping system for VLF2 Phase 3,accounting for ore loading effects. Given <br /> maximum volumetric flow rate= 17,000 gpm, solution application rate=0.0055 gpm/ft2. <br /> ASSUMPTIONS <br /> 1. Secondary pipes mannings n =0.012,Tertiary pipes mannings n =0.015 <br /> 2. Hydraulic conductivity of DCF=0.036 ft/s <br /> 3. Max head on liner= 2 ft <br /> 4.Tertiary pipes designed for full flow, assuming"arching" of DCF above,with a FOS of 1.5,conservative 0%slope <br /> 5.Secondary pipes designed assuming a pipe collapse configuration ("figure 8") <br /> METHODOLOGY <br /> REFERENCES <br /> 1.AutoCAD Civil 3D 2018 <br /> 2. Cripple Creek&Victor Gold Mining Company Squaw Gulch Valley Leach Facility Design,AMEC Earth and <br /> Environmental, September 1, 2011. <br /> CONCLUSIONS <br /> Filename: <br /> P:\Projects\0106.033 VLF2 Phase 3 Detailed Design\H-CALCULATIONS\Pipe Calcs\[Pipe Sizing and Spacing_CC&V.xlsx]Calc Cover-HVSC Pipes <br />
The URL can be used to link to this page
Your browser does not support the video tag.