Laserfiche WebLink
Cripple Creek&Victor Gold Mining Company <br /> Valley Leach Facility 2 Phase 3 Detailed Design ■ <br /> Geotechnical Investigation Findings <br /> NewFields Project No.475.0106.033 <br /> November 13,2019 <br /> �WWOIO� <br /> zipro 3-.� <br /> 7S- , <br /> BH06: Split Spoon Sample from 2.5-4 ft depth <br /> t x; <br /> 1 <br /> r, <br /> zV <br /> I <br /> I <br /> BH06: Split Spoon Sample from 5-6.5 ft depth <br />