Laserfiche WebLink
Cripple Creek&Victor Gold Mining Company <br /> Valley Leach Facility 2 Phase 3 Detailed Design ■ <br /> Geotechnical Investigation Findings <br /> NewFields Project No.475.0106.033 <br /> November 13,2019 <br /> .'�..~rs. � • 4Yl <br /> .� a Ull <br /> 1w lL f, t <br /> • O <br /> BH02: Split Spoon Sample from 15-16.5 ft depth <br /> 4 Ai <br /> fj <br /> - <br /> �s <br /> pow <br /> PE T <br /> '�1NG�oz :1 <br /> -1. Z' <br /> BH02: Split Spoon Sample from 20-21.5 ft depth <br />