Laserfiche WebLink
BH-06 <br /> NewFields PAGE 2 OF 2 <br /> CLIENT Cripple Creek&Victor Gold Mining Company PROJECT NAME Squaw Gulch VLF2 Phase 3 Geotechnical Investigation <br /> PROJECT NUMBER 475.0106.033 PROJECT LOCATION Cripple Creek,CO <br /> ATTERBER <br /> w LIMITS <br /> U _ lL o J N <br /> (n M`� W 0 U) <br /> a � <br /> =c� �w �rD wW Dr > Z w <br /> > w Q O MATERIAL DESCRIPTION -j CO _j D Q 0 v �w U x Lu 0 LL C <br /> dD m0> Uz Oz 0� H00 U o o W <br /> W 0 QZ UZ w�— �0 dJ QZ o of <br /> U U J <br /> 35 a <br /> 10145 silty GRAVEL(GM)with sand angular,medium to 39-33-23 <br /> IL o coarse grained sand,nonplastic,moist,brown SS (56) 13 7.4 51 36.3 12.7 <br /> z <br /> z <br /> 0 <br /> 0 0 <br /> J <br /> m <br /> f7 <br /> 0 <br /> 40 0 <br /> 0 10140 <br /> 9 SS 9 11-10 10 <br /> zz (21) <br /> o <br /> (7 <br /> U) <br /> w <br /> > o <br /> 2 <br /> 45 <br /> LU <br /> 10135 SS 9-10-8 6 <br /> a < (18) <br /> 0 <br /> x <br /> U <br /> w <br /> 0 o <br /> O <br /> w <br /> O <br /> 50 0 <br /> Q 10130 SS 10-9-9 10 <br /> o (18) <br /> a <br /> Bottom of Borehole at 51.5'. <br /> LU <br /> w <br /> M <br /> w <br /> x <br /> a <br /> N <br /> w <br /> J <br /> m <br /> m <br /> 0 <br /> ui <br /> 0 <br /> 0 <br /> Cn <br /> L) <br /> U <br /> w <br /> O <br /> _a <br /> a <br /> 0 <br /> rn <br /> v <br /> N <br /> O <br /> F <br /> O <br /> m <br /> a <br /> U <br /> Cn <br /> H <br /> z <br /> Z_ <br /> N <br /> Z <br /> S <br /> M <br /> x <br /> U <br /> w <br /> 0 <br /> O <br /> w <br /> C7 <br /> z <br /> Z <br />