Laserfiche WebLink
BH-04 <br /> NeWFieldS PAGE 2 OF 2 <br /> CLIENT Cripple Creek&Victor Gold Mining Company PROJECT NAME Squaw Gulch VLF2 Phase 3 Geotechnical Investigation <br /> PROJECT NUMBER 475.0106.033 PROJECT LOCATION Cripple Creek,CO <br /> ATTERBER <br /> w - LIMITS <br /> < c� <br /> �w 3r� wW �� F > Z w <br /> > w Q O MATERIAL DESCRIPTION -g -,D Q 0 0 T w o r U W � U) � 2 <br /> o_� co0> U 5 C7 <br /> -1 0 (D 2z Uz LU O~z (�� U)Z o 0 0Lu <br /> 35 0_ <br /> poorly graded GRAVEL(GP-GM)with silt and sand <br /> 0 ° angular,medium to coarse grained sand,moist,brownish SS (2) 0 <br /> 0 oU red(continued) <br /> z <br /> 0 ° <br /> J <br /> °] O <br /> 10175 <br /> 0 40 ° <br /> 0 <br /> 0 o SS 987 3 <br /> z (15) <br /> 0 <br /> a ° <br /> � o <br /> U) <br /> w <br /> > o <br /> z 10170 <br /> w 45 0 <br /> o SS 11(2��11 12 5.6 61.2 32.3 6.5 <br /> 0 O <br /> U <br /> W <br /> F ° <br /> W � <br /> 10165 <br /> 50 0 <br /> o O SS 11-8-9 13 <br /> o (17) <br /> LU <br /> J_ ° <br /> ocl <br /> W � <br /> m <br /> L1 ° <br /> a 10160 <br /> a 55 0 <br /> ° SS 8820 10 <br /> > (28) <br /> � o <br /> 0 <br /> 0 <br /> o ° <br /> U) <br /> U O <br /> 10155 oCl <br /> 0 60 ° <br /> a o SS 7-7-6 8 <br /> (13) <br /> Bottom of Borehole at 61.5'. <br /> Q <br /> N <br /> O <br /> H <br /> co <br /> Q <br /> J <br /> 0 <br /> H <br /> z <br /> Z <br /> co <br /> z <br /> S <br /> m <br /> 2 <br /> U <br /> w <br /> F <br /> O <br /> w <br /> z <br />