My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-12-13_REVISION - M1980244 (37)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2019-12-13_REVISION - M1980244 (37)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2025 8:03:38 AM
Creation date
12/16/2019 1:08:08 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
12/13/2019
Doc Name Note
Exhibit N - Appendix 1
Doc Name
Request For Amendment To Permit
From
CC&V
To
DRMS
Type & Sequence
AM13
Email Name
TC1
MAC
BFB
ERR
JPL
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NEWMONT <br /> GOLDCORR <br /> ■ Drain Cover Fill <br /> o Geomembrane Construction Quality Assurance <br /> ■ Geomembrane Third Party Conformance Testing <br /> ■ Geomembrane Panel Deployment <br /> ■ Geomembrane Fusion Seaming <br /> ■ Geomembrane Extrusion Seaming <br /> ■ Geomembrane Destructive Testing <br /> ■ Geomembrane Pressure Testing <br /> ■ Geomembrane Defects and Repairs <br /> ■ Geomembrane Acceptance <br /> • PROJECT DEVIATIONS <br /> • ENGINEER'S OPINION stamp <br /> ISSUED FOR CONSTRUCTION DRAWINGS <br /> • COVER SHEET stamp <br /> • PROJECT SITE PLAN VIEW stamp <br /> • EXISTING SITE CONDITIONS stamp <br /> • GRADING PLAN stamp <br /> • GRADING PLAN ISOPACH stamp <br /> • LINER LIMITS stamp <br /> • VALLEY LEACH FACILITY SECTIONS AND DETAILS SHEET stamp <br /> • UNDERDRAIN DETAIL SHEET stamp * <br /> • LEAK DETECTION & EROSION CONTROL DETAILS stamp <br /> • SOLUTION CONCENTRATION PIPING LAYOUT stamp <br /> • SOLUTION COLLECTION SYSTEM DETAILS stamp <br /> RECORD OF CONSTRUCTION DRAWINGS <br /> • TOP OF SOIL LINER FILL AS-BUILT stamp <br /> • UNDERDRAIN AS-BUILT stamp <br /> • SOLUTION COLLECTION SYSTEM AS-BUILT stamp <br /> • LEAK DETECTION TRENCH AS-BUILT stamp * <br /> • GEOMEMBRANE PANEL LAYOUT AS-BUILT stamp <br /> • DRAIN COVER FILL AS-BUILT ISOPACH stamp <br /> LIST OF TABLES <br /> Cripple Creek&Victor Gold Mining Company Exhibit U <br /> Cresson Project Amendment 13 <br /> 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.