My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-12-13_REVISION - M1980244 (61)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2019-12-13_REVISION - M1980244 (61)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2025 7:59:33 AM
Creation date
12/16/2019 1:05:18 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
12/13/2019
Doc Name Note
Exhibit K - M
Doc Name
Request For Amendment To Permit
From
CC&V
To
DRMS
Type & Sequence
AM13
Email Name
TC1
MAC
BFB
ERR
JPL
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
125
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NEWMONT <br /> GOLDCORR <br /> 1 RECLAMATION COSTS <br /> The following sections present a summary of finical liabilities associated with the Phase 3 of the <br /> Valley Leach Facility 2 (VLF2) expansion and all previous existing labilities. A detailed analysis of <br /> reclamation costs is provided herein. <br /> 1.1 Introduction and Approach <br /> The financial warranty calculations addressed below include the reclamation for the entire <br /> Cresson Project, including the activities of this Amendment 13. Updated and current reclamation <br /> costs have been provided, including facility changes to support the planned activities associated <br /> with this Amendment 13. <br /> Included in the cost calculation are the following facilities and related cost items. <br /> • Portal Access <br /> • Portal support facilities <br /> • Development mining areas <br /> • Main Cresson Mine area <br /> • East Cresson Mine area <br /> • North Cresson Mine area <br /> • Squaw Gulch Overburden Storage Area (SGOSA) <br /> • East Cresson Overburden Storage Area (ECOSA) <br /> • Valley Leach Facility (VLF) Rinsing and Neutralization for both Arequa Gulch Valley <br /> Leach Facility (AGVLF, a.k.a VLF1) and Squaw Gulch Valley Leach Facility (SGVLF, <br /> a.k.a VLF2) <br /> • VLF Physical Reclamation for both AGVLF and SGVLF <br /> • Arequa Gulch Adsorption, Desorption and Recovery (AGADR) and Squaw Gulch <br /> Adsorption, Desorption and Recover (SGADR) facilities <br /> • High Grade (HG) Mill facilities <br /> • External Solution storage Pond (ESP), Sediment Ponds, and Storm Water Control <br /> Basins <br /> • Monitoring wells and piezometers <br /> • Haul roads <br /> • Growth Medium storage areas <br /> • Powerlines <br /> • Support buildings and footprints <br /> • Surface Mine Highwall fencing <br /> • Clean-up and miscellaneous areas <br /> • Revegetation repairs and maintenance <br /> Cripple Creek&Victor Gold Mining Company Exhibit L <br /> Cresson Project Amendment 13 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.