Laserfiche WebLink
NEWMONT <br /> GOLDCORR <br /> 1 RECLAMATION COSTS <br /> The following sections present a summary of finical liabilities associated with the Phase 3 of the <br /> Valley Leach Facility 2 (VLF2) expansion and all previous existing labilities. A detailed analysis of <br /> reclamation costs is provided herein. <br /> 1.1 Introduction and Approach <br /> The financial warranty calculations addressed below include the reclamation for the entire <br /> Cresson Project, including the activities of this Amendment 13. Updated and current reclamation <br /> costs have been provided, including facility changes to support the planned activities associated <br /> with this Amendment 13. <br /> Included in the cost calculation are the following facilities and related cost items. <br /> • Portal Access <br /> • Portal support facilities <br /> • Development mining areas <br /> • Main Cresson Mine area <br /> • East Cresson Mine area <br /> • North Cresson Mine area <br /> • Squaw Gulch Overburden Storage Area (SGOSA) <br /> • East Cresson Overburden Storage Area (ECOSA) <br /> • Valley Leach Facility (VLF) Rinsing and Neutralization for both Arequa Gulch Valley <br /> Leach Facility (AGVLF, a.k.a VLF1) and Squaw Gulch Valley Leach Facility (SGVLF, <br /> a.k.a VLF2) <br /> • VLF Physical Reclamation for both AGVLF and SGVLF <br /> • Arequa Gulch Adsorption, Desorption and Recovery (AGADR) and Squaw Gulch <br /> Adsorption, Desorption and Recover (SGADR) facilities <br /> • High Grade (HG) Mill facilities <br /> • External Solution storage Pond (ESP), Sediment Ponds, and Storm Water Control <br /> Basins <br /> • Monitoring wells and piezometers <br /> • Haul roads <br /> • Growth Medium storage areas <br /> • Powerlines <br /> • Support buildings and footprints <br /> • Surface Mine Highwall fencing <br /> • Clean-up and miscellaneous areas <br /> • Revegetation repairs and maintenance <br /> Cripple Creek&Victor Gold Mining Company Exhibit L <br /> Cresson Project Amendment 13 <br /> 1 <br />