Laserfiche WebLink
NEWMONT <br />GOLDCORP <br />used in the past at the site and may be installed, if needed. Experience with dilute sodium cyanide <br />solution leach tanks has shown that birds do not tend to use these as a water source due to the <br />small open area of each tank, the noise associated with the agitation, and the level of activity of <br />the milling operations. Leaks or spills from the cyanidation leach tanks are contained within the <br />curbed concrete foundation for the tanks. <br />4.2 Water Balance and Recycling <br />No changes to the HG Mill water balance are anticipated as part of Amendment 13. <br />4.3 Stormwater Control at the High -Grade Mill Facilities <br />Stormwater from the HG Mill is directed towards the VLF2 or recycled as fresh water back into <br />the process. High pH water and other process overfill is directed to the VLF1. More details about <br />stormwater management from the HG Mill may be found in the sitewide Stormwater Management <br />Plan, which is provided in Appendix 3 of this Amendment 13 permit. <br />Cripple Creek & Victor Gold Mining Company <br />Cresson Project Amendment 13 <br />20 <br />Exhibit D <br />