My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-12-13_REVISION - M1980244 (68)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2019-12-13_REVISION - M1980244 (68)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2020 2:05:04 PM
Creation date
12/16/2019 1:01:57 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
12/13/2019
Doc Name Note
Applicaiton, Exhibit A - J
Doc Name
Request For Amendment To Permit (Vol. I of IV) Part 1
From
CC&V
To
DRMS
Type & Sequence
AM13
Email Name
TC1
MAC
BFB
ERR
JPL
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NEWMONT <br />GOLDCORP.. <br />0 <br />angles listed above. After excavation, back break along the bench crests will reduce the catch -bench widths <br />to the required 80 percent reliability of achieving 26 feet for double benching and 19 feet for single benching <br />for sectors controlled by back break. 2. A mid -bench offset of 8 feet was assumed for double benching <br />Cripple Creek & Victor Gold Mining Company <br />Cresson Project Amendment 13 <br />13 <br />Exhibit D <br />Design <br />Parameters <br />Design <br />Design <br />- <br />Inter -ramp <br />Mining Area <br />Bench <br />Bench - <br />Sector <br />Sl ..- .- <br />- <br />(ft) Angle <br />Schist Island <br />3 <br />460 <br />Portion of North <br />Bench <br />D <br />43.5 710 <br />Cresson <br />Globe Hill portion <br />Weak Globe <br />4 <br />390 <br />Global <br />S <br />23 <br />600 <br />of North Cresson <br />Hill Pipe Zone <br />Globe Hill portion <br />Weak Globe <br />5 <br />40° <br />Global <br />S <br />21.5 <br />60° <br />of North Cresson <br />Hill Pipe Zone <br />Globe Hill portion <br />Weak Globe <br />6 <br />44° <br />Global <br />S <br />19.9 <br />65° <br />of North Cresson <br />Hill Pipe Zone <br />Globe Hill portion <br />Weak Globe <br />7 <br />380 <br />Global <br />S <br />24.6 <br />60° <br />of North Cresson <br />Hill Pipe Zone <br />Globe Hill portion <br />8 <br />510 <br />Bench <br />D <br />35.3 <br />73° <br />of North Cresson <br />Globe Hill portion <br />Weak Globe <br />9 <br />40° <br />Global <br />S <br />21.5 <br />60° <br />of North Cresson <br />Hill Pipe Zone <br />Globe Hill and <br />10 <br />53° <br />WHEX portion of <br />Bench <br />D <br />37.9 <br />780 <br />North Cresson <br />Globe Hill and <br />11 <br />510 <br />WHEX portion of <br />Bench <br />D <br />37.9 <br />750 <br />North Cresson <br />WHEX portion of <br />12 <br />50° <br />Bench <br />D <br />40 <br />750 <br />North Cresson <br />WHEX portion of <br />13 <br />40° <br />Bench <br />D <br />57.9 <br />70° <br />North Cresson <br />WHEX portion of <br />14 <br />45° <br />Bench <br />D <br />44.5 <br />70° <br />North Cresson <br />Notes- 1 Slopes should be desioned and excavated <br />to the mean catch -bench widths and <br />bench -face <br />angles listed above. After excavation, back break along the bench crests will reduce the catch -bench widths <br />to the required 80 percent reliability of achieving 26 feet for double benching and 19 feet for single benching <br />for sectors controlled by back break. 2. A mid -bench offset of 8 feet was assumed for double benching <br />Cripple Creek & Victor Gold Mining Company <br />Cresson Project Amendment 13 <br />13 <br />Exhibit D <br />
The URL can be used to link to this page
Your browser does not support the video tag.