My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-12-13_REVISION - M1980244 (68)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2019-12-13_REVISION - M1980244 (68)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2020 2:05:04 PM
Creation date
12/16/2019 1:01:57 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
12/13/2019
Doc Name Note
Applicaiton, Exhibit A - J
Doc Name
Request For Amendment To Permit (Vol. I of IV) Part 1
From
CC&V
To
DRMS
Type & Sequence
AM13
Email Name
TC1
MAC
BFB
ERR
JPL
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table D-3 <br />NEWMONT <br />GOLDCORA <br />Main <br />Cresson <br />Altman/ Wildhorse WHEX Schist Globe SGOSA ECOSA <br />ECME Island Hill <br />MMM=1026 <br />0'7- <br />Notes: 1. WHEX = Wildhorse Extension, Altman/ECME = East Cresson Mine Altman. 2. Actual mining <br />schedule/sequence may vary due to changing mining or economic conditions. <br />Mining activities and sequencing will not change from previous amendments, except for the <br />sequence of backfilling the Schist Island Pit area with the construction of VLF2 Phase 3. Details <br />of the VLF2 Phase 3 sequencing are provided in the Valley Leach Facility 2 Phase 3 Detailed <br />Design Report provided in Appendix 1. Note that the annual mining and reclamation backfill <br />progression is approximate and subject to change due to economics, weather conditions and <br />other factors. <br />3.1 Clearing, Grubbing and Growth Medium Removal <br />The VLF2 Phase 3 PSSA embankment area will require minor clearing, grubbing and growth <br />medium removal as described in the Valley Leach Facility 2 Phase 3 Detailed Design Report <br />included in Appendix 1. The proposed Phase 3 expansion will occur largely within already <br />disturbed areas and is entirely within the affected lands boundary. As such, the majority of the <br />area is already cleared and grubbed in preparation for the work. <br />Cripple Creek & Victor Gold Mining Company <br />Cresson Project Amendment 13 <br />9 <br />Exhibit D <br />
The URL can be used to link to this page
Your browser does not support the video tag.