My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-12-13_REVISION - M1980244 (68)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2019-12-13_REVISION - M1980244 (68)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2020 2:05:04 PM
Creation date
12/16/2019 1:01:57 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
12/13/2019
Doc Name Note
Applicaiton, Exhibit A - J
Doc Name
Request For Amendment To Permit (Vol. I of IV) Part 1
From
CC&V
To
DRMS
Type & Sequence
AM13
Email Name
TC1
MAC
BFB
ERR
JPL
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NEWMONT <br />GOLDCORP <br />overall estimated schedule including activity durations for construction, operation, and <br />reclamation of the Cresson Project. Tables D-2 and D-3 provide the annual sequence of mining <br />and overburden placement, respectively, in each of the mine areas and OSAs. Actual <br />development schedules may vary from those presented below and will be reported in the annual <br />reports to DRMS. <br />Table D-1: Approximate Time Schedule of <br />Activity <br />Construction, Operations and <br />Duration in Start Year <br />Years <br />Reclamation <br />Complete <br />Install and Maintain Erosion Controls — Mine <br />and Overburden Areas <br />29 <br />Continuing <br />2041 or when <br />revegetation is <br />established <br />Clear and Grub Mine Areas <br />11 <br />When <br />needed <br />2022 <br />Construct Haul Roads <br />13 <br />Wh ded <br />2025 <br />Mining and Ore Loading VLF1 <br />1 <br />Continuing <br />Completed in 2016 <br />but capacity still <br />available, if needed <br />Mining and Ore Loading VLF2 <br />10 <br />2016 <br />2025 <br />Underground Exploration and Mining <br />9 <br />2019 <br />2025 <br />Processing of Ore in HG Mill <br />9 <br />2015 <br />2024 <br />Crusher and Conveyor Reclamation <br />1 <br />2026 <br />2026 <br />Mine and Overburden Storage Area <br />Reclamation <br />20 <br />Continuing <br />2032 <br />Complete the Leaching of Ore on the VLF1 <br />12 <br />Continuing <br />2024 <br />Complete Neutralization of VLF1 <br />6 <br />2024 <br />2033 <br />Reclaim ADR1 Facilities <br />2 <br />2039 <br />2041 <br />VLF1 Reclamation <br />2 <br />2031 <br />2032 <br />Complete the Leaching of Ore on the VLF2 <br />17 <br />2016 <br />2033 <br />Complete Neutralization of VLF2 <br />6 <br />2033 <br />2039 <br />ADR2 Facilities Reclamation <br />2 <br />2039 <br />2041 <br />VLF2 Reclamation <br />2 <br />2039 <br />2041 <br />Post Closure Monitoring <br />5 <br />2041 <br />2046 <br />Notes: 1. Actual mining schedule/sequence may vary due to changing mining or economic conditions. <br />Cripple Creek & Victor Gold Mining Company <br />Cresson Project Amendment 13 <br />7 <br />Exhibit D <br />
The URL can be used to link to this page
Your browser does not support the video tag.