My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-12-13_REVISION - M1980244 (68)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2019-12-13_REVISION - M1980244 (68)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2020 2:05:04 PM
Creation date
12/16/2019 1:01:57 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
12/13/2019
Doc Name Note
Applicaiton, Exhibit A - J
Doc Name
Request For Amendment To Permit (Vol. I of IV) Part 1
From
CC&V
To
DRMS
Type & Sequence
AM13
Email Name
TC1
MAC
BFB
ERR
JPL
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NEWMONT <br />GOLDCORP,. <br />Processing higher grade, primarily sulfide ore from surface operations will continue through the <br />High -Grade Mill (HG Mill). Processing of ore and mineralized waste material from surface <br />operations will continue to occur through placement of ore on VLF2 per approved Technical <br />Revision (TR) 104 (TR -104). Underground exploration of the Main Cresson Pit is anticipated to <br />begin with the construction of a portal beginning in Q2 2020 (approved in TR -116). The current <br />list of Technical Revisions is provided in Appendix 2. <br />The projected mine sequencing for the Cresson Project is included in the discussions below, <br />although it is important to note that the rate of mining as well as other timelines presented herein <br />are approximate and depend on anticipated production rates, mining fleet, crusher availability, <br />gold price, gold recovery, and other factors, such as fuel prices and weather conditions. As such, <br />these approximate timelines may change and result in a shorter or a longer overall mine life. <br />Details are provided on pre -mining activities of clearing and grubbing, mining operation <br />development including drilling and blasting, mine area stability designs, underground <br />development work, loading and hauling, crushing and conveying, and overburden handling. The <br />following sections also describe the construction, surface water handling, stability of the OSAs, <br />and mine area backfilling. Haul road and access road specifications are described for those traffic <br />routes that are within the mining areas. <br />Cripple Creek & Victor Gold Mining Company <br />Cresson Project Amendment 13 <br />E <br />Exhibit D <br />
The URL can be used to link to this page
Your browser does not support the video tag.