Laserfiche WebLink
NEWMONT <br />GOLDCORP. <br />TABLE OF CONTENTS <br />DRAWING C-1: Affected Lands Boundary and Adjacent Land Owners <br />DRAWING C -1a: Affected Lands Boundary and Adjacent Land Owners with Permanent <br />Manmade Structures <br />DRAWING C-2: Existing and Approved Facilities <br />DRAWING C -2a: Existing and Approved Facilities, Carlton Tunnel <br />DRAWING C -2b: Existing Utilities <br />DRAWING C-3: Proposed Facilities — Buildings and Utilities <br />DRAWING C -4a: Changes in Disturbance Categories <br />DRAWING C -4b: Growth Medium Storage Locations <br />DRAWING C-5: [Not Included. Mining sequence has not changed from previous <br />amendments. See Appendix 1 for VLF2 Phase 3 construction sequence <br />drawings.] <br />DRAWING C-6: [Not Included. Mining plan cross sections have not changed from previous <br />amendments. See Appendix 1 for VLF2 Phase 3 construction cross-section <br />drawings.] <br />DRAWING C-7: District Geology <br />Cripple Creek & Victor Gold Mining Company Exhibit C <br />Cresson Project Amendment 13 <br />