Laserfiche WebLink
NEWMONT <br />GOLDCORP <br />1 INTRODUCTION <br />Per Section 6.4.1, this Exhibit contains (a) the legal description (i.e., township, range, and section) <br />to at least the nearest quarter -quarter section, and (b) location of the main entrance to the mine <br />site reported as latitude/longitude. <br />1.1 Main Entrance <br />The main entrance to the mine is the Iron Clad Security gate, which is located at: <br />Latitude 380 42' 40.95", Longitude 1050 09' 35.41" <br />1.2 Legal Description <br />Township 16 South, Range 69 West, 6th Principle Meridian. <br />Section 06: <br />NW 1/4, portions thereof. <br />Township 15 South, Range 70 West, 6th Principle Meridian. <br />Section 13: <br />SE 1/4, portions thereof. <br />Section 24: <br />NW 1/4, portions thereof, <br />SW 1/4, portions thereof, <br />NE 1/4, portions thereof, <br />SE 1/4, portions thereof. <br />Section 25: <br />NW 1/4, portions thereof, <br />SW 1/4, portions thereof, <br />NE %, portions thereof, <br />SE 1/4, portions thereof. <br />Section 36: <br />E '/2, all thereof. <br />Cripple Creek & Victor Gold Mining Company <br />Cresson Project Amendment 13 <br />1 <br />Exhibit A <br />