Laserfiche WebLink
NEWMONT <br />GOLDCORP <br />Rule Number <br />Brief Description of Rule <br />Requirement <br />Location in Application <br />6.4.21(14)(b) <br />Representative evaluations <br />Appendix 1 to A-11 application <br />6.4.21(14)(c -e) <br />Fate analysis <br />Appendix 1 to A-11 application <br />6.4.21(15)(a -b) <br />Construction schedule <br />Exhibit D <br />6.4.21(16) <br />Quality Assurance and Quality Control <br />during construction <br />Exhibit U, Appendix 1 <br />6.4.21(17)(a -b) <br />Soil survey map <br />Exhibit C <br />6.4.21(17)(c) <br />Soil table <br />Exhibit 1 <br />6.4.21(18) <br />Wildlife mitigation and protection <br />Exhibit H and Appendix 8 <br />6.4.21(19) <br />Disposal of tailings and sludges <br />Exhibit U <br />6.5.1-4 <br />Geotechnical evaluation <br />Exhibit D and E <br />7.1 <br />Compliance for designated mining <br />operations <br />Exhibit U <br />7.2 <br />Determination of designated mining <br />operations <br />Exhibit U <br />7.3 <br />Construction and certification <br />Appendix 1 <br />8 <br />Emergency Response Plan <br />Exhibit U and Appendix 12 <br />Cripple Creek & Victor Gold Mining CompanyDRMS Compliance List <br />Cresson Project Amendment 13 <br />