My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-12-13_REVISION - M1980244 (68)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2019-12-13_REVISION - M1980244 (68)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2020 2:05:04 PM
Creation date
12/16/2019 1:01:57 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
12/13/2019
Doc Name Note
Applicaiton, Exhibit A - J
Doc Name
Request For Amendment To Permit (Vol. I of IV) Part 1
From
CC&V
To
DRMS
Type & Sequence
AM13
Email Name
TC1
MAC
BFB
ERR
JPL
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NEWMONT <br />GOLDCORP <br />Permit M-1980-244 <br />Cresson Project Amendment 13 <br />Table of Contents <br />112(d) DESIGNATED MINING OPERATION RECLAMATION PERMIT APPLICATION <br />FORM <br />CONFORMITY WITH REGULATORY REQUIREMENTS (HARDROCK RULES <br />COMPLIANCE LIST) <br />EXECUTIVE SUMMARY <br />EXHIBITS <br />Exhibit A Legal Description <br />Exhibit B Index Map <br />Map B-1 Index Map <br />Exhibit C Pre -Mining and Mining Plan Maps of Affected Lands: <br />Drawing C-1 <br />Permit Boundary and Adjacent Landowners <br />Drawing C -1a <br />Permit Boundary and Permanent Man -Made <br />Structures within 200 Feet <br />Drawing C-2 <br />Existing and Approved Facilities <br />Drawing C -2a <br />Existing and Approved Facilities, Carlton Tunnel <br />Drawing C -2b <br />Existing Utilities <br />Drawing C-3 <br />Proposed Facilities Buildings and Utilities <br />Drawing C-4 <br />Proposed Overburden and Mines <br />Drawing C -4a <br />Changes in Disturbance Categories <br />Drawing C -4b <br />Growth Medium Storage Area Locations <br />Drawing C-5 <br />[Not Included. Mining sequence has not changed from <br />previous amendments. See Appendix 1 for VLF2 <br />Phase 3 construction sequence drawings.] <br />Cripple Creek & Victor Gold Mining Company Table of Contents <br />Cresson Project Amendment 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.