Laserfiche WebLink
NEWMONT <br />GOLDCORP <br />Permit M-1980-244 <br />Cresson Project Amendment 13 <br />Table of Contents <br />112(d) DESIGNATED MINING OPERATION RECLAMATION PERMIT APPLICATION <br />FORM <br />CONFORMITY WITH REGULATORY REQUIREMENTS (HARDROCK RULES <br />COMPLIANCE LIST) <br />EXECUTIVE SUMMARY <br />EXHIBITS <br />Exhibit A Legal Description <br />Exhibit B Index Map <br />Map B-1 Index Map <br />Exhibit C Pre -Mining and Mining Plan Maps of Affected Lands: <br />Drawing C-1 <br />Permit Boundary and Adjacent Landowners <br />Drawing C -1a <br />Permit Boundary and Permanent Man -Made <br />Structures within 200 Feet <br />Drawing C-2 <br />Existing and Approved Facilities <br />Drawing C -2a <br />Existing and Approved Facilities, Carlton Tunnel <br />Drawing C -2b <br />Existing Utilities <br />Drawing C-3 <br />Proposed Facilities Buildings and Utilities <br />Drawing C-4 <br />Proposed Overburden and Mines <br />Drawing C -4a <br />Changes in Disturbance Categories <br />Drawing C -4b <br />Growth Medium Storage Area Locations <br />Drawing C-5 <br />[Not Included. Mining sequence has not changed from <br />previous amendments. See Appendix 1 for VLF2 <br />Phase 3 construction sequence drawings.] <br />Cripple Creek & Victor Gold Mining Company Table of Contents <br />Cresson Project Amendment 13 <br />