Laserfiche WebLink
EXHIBIT 13C <br /> Table 13C-10 Collom Primary Crusher Demolition* <br /> Item Task <br /> Primary 417 <br /> Crusher <br /> *The item contained on this table references the Division's Reclamation Cost Estimate (RCE) <br /> and call out specific tasks within the RCE. The RCE can be found in Exhibit 13B. <br /> Table 13C-11 Collom Facilities Concrete Demolition* <br /> Item Total Quantity <br /> (cubicyards) <br /> Concrete 1,293 <br /> *This volume includes all concrete at the Collom Facilities for all tables in this section. <br /> Table 13C-12 Miscellaneous Facilities Demolition <br /> Item Task Build <br /> Size/Material <br /> Blaster Building 50'x80'xl9' <br /> 4 Steel Buildin <br /> Raw Water Tank* 417 <br /> ANFO Silos* 417 <br /> Electrical Substation* 417 <br /> Communications Building N/A 20' x 20' Steel <br /> Building <br /> Main Communication Tower N/A 100' Tower/25 <br /> Pad cubic yard <br /> concrete pad <br /> Meteorological Station N/A 30' Tower/4 <br /> cubic yards of <br /> concrete <br /> Communication Building N/A 8'x10' Steel <br /> (Collom Substation) Building <br /> Communication Building N/A 8'x10' Steel <br /> (Security Area) Building <br /> Crew Trailer N/A 8'x24' Trailer <br /> *The items contained on this table reference the Division's Reclamation Cost Estimate (RCE) <br /> and call out specific task(s) within the RCE. The RCE can be found in Exhibit 13B. <br /> Table 13C-12A Collom Potable Water Well <br /> Well Name Depth -Diameter <br /> Collom Potable Water Well 1150' —83/4 <br /> Volume 20 Page 9 Revision Date: 11/20/19 <br /> Revision No.: MR-212 <br />