My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-12-11_REVISION - M1977211
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977211
>
2019-12-11_REVISION - M1977211
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2025 7:51:47 AM
Creation date
12/12/2019 1:46:46 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977211
IBM Index Class Name
REVISION
Doc Date
12/11/2019
Doc Name
Adequacy Review Response
From
Castle Aggregate
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Response:Topsoil will be stockpiled following industry and CDRMS standards and regulations.These <br /> documents allow for various stockpile configurations depending on the site needs. <br /> 12. Same as Comment 6. <br /> Response: Same as Comment 6. <br /> 13. Will tree planting be followed by an initial watering? <br /> Response:The trees will be watered after planting. <br /> 14. The French Drains are not included in the design like they were in Amendment 3. <br /> Response: Castle has already constructed the French Drains. <br /> 15. Continuous flow from the northern drainage could impact slope stability. <br /> Response:The geotechnical assessments for the highwall and the backfilled slope consider the presence <br /> of groundwater and potential impacts on slope stability. <br /> 16. Exhibit G-1 does not show the interceptor ditch. <br /> Response:The ditch is included on Exhibit G-1, which has been revised to improve legibility. <br /> 17. The maps do not show the existing water management structures and specify which ones will <br /> remain. <br /> Response:The maps in Exhibit C have been revised to address this comment. <br /> 18. Water management structures are never maintenance free. <br /> Response:This text has been removed from the permit applications to address this comment. <br /> 19. Same as Comment 16. <br /> Response: Same as Comment 16. <br /> 20. Same as Comment 16. <br /> Response: Same as Comment 16. The map is intended to be viewed on 11x17 paper. <br /> 21. The Sedcad model may need to be revised to include the ditches at the top of the quarry. <br /> Response:The Sedcad model includes all the ditches required to reclaim the quarry. See response to <br /> comment 16. <br /> Pikeview Quarry Amendment 4, Response to Adequacy <br /> December 11, 2019 <br />
The URL can be used to link to this page
Your browser does not support the video tag.