Laserfiche WebLink
Response:Topsoil will be stockpiled following industry and CDRMS standards and regulations.These <br /> documents allow for various stockpile configurations depending on the site needs. <br /> 12. Same as Comment 6. <br /> Response: Same as Comment 6. <br /> 13. Will tree planting be followed by an initial watering? <br /> Response:The trees will be watered after planting. <br /> 14. The French Drains are not included in the design like they were in Amendment 3. <br /> Response: Castle has already constructed the French Drains. <br /> 15. Continuous flow from the northern drainage could impact slope stability. <br /> Response:The geotechnical assessments for the highwall and the backfilled slope consider the presence <br /> of groundwater and potential impacts on slope stability. <br /> 16. Exhibit G-1 does not show the interceptor ditch. <br /> Response:The ditch is included on Exhibit G-1, which has been revised to improve legibility. <br /> 17. The maps do not show the existing water management structures and specify which ones will <br /> remain. <br /> Response:The maps in Exhibit C have been revised to address this comment. <br /> 18. Water management structures are never maintenance free. <br /> Response:This text has been removed from the permit applications to address this comment. <br /> 19. Same as Comment 16. <br /> Response: Same as Comment 16. <br /> 20. Same as Comment 16. <br /> Response: Same as Comment 16. The map is intended to be viewed on 11x17 paper. <br /> 21. The Sedcad model may need to be revised to include the ditches at the top of the quarry. <br /> Response:The Sedcad model includes all the ditches required to reclaim the quarry. See response to <br /> comment 16. <br /> Pikeview Quarry Amendment 4, Response to Adequacy <br /> December 11, 2019 <br />