My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-12-03_HYDROLOGY - M2001107
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M2001107
>
2019-12-03_HYDROLOGY - M2001107
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 3:39:41 PM
Creation date
12/12/2019 11:58:58 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001107
IBM Index Class Name
Hydrology
Doc Date
12/3/2019
Doc Name
Substitute Water Supply Plan
From
DWR
To
Clear Water Solutions
Email Name
PSH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Oivis ion h as idertif 1-ed four approaches for operatom, <br /> 1- File f in,ancia I warranty that will ensure back filling of the pit to cover the expo5ed grou rid water to a <br /> depth of two feet above the static ground water level or., <br /> 2- Obtialn 0 court aVproved augmentation plan prior to exposing ground wMer or. <br /> I File a financial warranty to cover the cost of installIng;-a clay liner or slurrV wal I that meet5 the <br /> Division of Water Resources requirements fUF PrEVenting grOund water exposure or.. <br /> 4. 04ta in approval from the Division of"later Resources that acknowledges compliance with the SEO'5 <br /> requirements pursuant to 37-90-117(11), <br /> The Division will work with operators on an individual basis as they move to implement one of these pia ns. it <br /> is Rely that options I and 3 WIR require the submittal of a tech nical revision or an a me-ndment to theeXi5ting <br /> p�rmito depending,on the nature of the current mining and reclamation plan and the proposed changes. <br /> I ncrc-a5ed finan IM warrantill-Lsp as a result of thesemodif!cations,may bu posted In a phased man ner not to <br /> E!xr-eed Lh ree yea rs- AmendMent.S or revisions cu rrently under revic-w will he re-quil red,to be approved by <br /> ,April 3Q,2011a rid may us-e the phased financiall warranty approach described above. New a pplicat ions going <br /> forward or pre5ently under revile by the Division will be required,to meet the requirements of one of the <br /> options 1-4 at the time of application a pproval- Failure of affe ed operators to initiat-e conta,c-t with the <br /> Dlvl&ion and gain compliance as described above coutd result hn an, enforcement action being issued by the <br /> D livis ion.,, <br /> If you have any questions, please contact Tony Waldron at a03-861,6-3567,extensbn B150. <br /> cc: Permit Id Site Name <br />
The URL can be used to link to this page
Your browser does not support the video tag.