My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-12-11_REPORT - C1996083 (2)
DRMS
>
Day Forward
>
Report
>
Coal
>
C1996083
>
2019-12-11_REPORT - C1996083 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2024 11:12:50 AM
Creation date
12/12/2019 9:13:32 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Report
Doc Date
12/11/2019
Doc Name
Quarterly Waste Bank Inspection Report Adequacy Review
From
DRMS
To
Bowie Resources, LLC
Annual Report Year
2019
Report Quarter_Month
3
Permit Index Doc Type
Waste Pile/Fill Report
Email Name
MAC
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L D <br /> Division of Reclamation, <br /> A&ID-,da <br /> Mining and Safety <br /> Department of Natural Resources <br /> December 11, 2019 <br /> Basil A. Bear <br /> Bowie Resources, LLC <br /> P.O. Box 1488 <br /> Paonia, CO 81428 <br /> Re: Bowie No. 2 Mine,Permit C-1996-083, <br /> Review of Waste Bank Inspection Report,3ra Quarter 2019 <br /> Dear Mr. Bear: <br /> The Division received the Bowie No. 2 Mine Waste Bank Inspection Report for the 3rd quarter of <br /> 2019 on October 23, 2019. We reviewed this report in the context of the following rules: <br /> 1. 4.09.1(1 1)(a)—The fill was inspected for stability by a registered engineer during the compaction <br /> of fill materials. No placement occurred during the third quarter. <br /> 2. 4.09.1(1 1)(b)—A qualified registered engineer provided to the Division a certified report; <br /> however, submittal was not within two weeks after the inspection of the waste bank was <br /> completed. Due to HBETs servers being hacked,per the report, it took several days to restore <br /> files associated with this report. The Division accepts this explanation of the timing of the <br /> submittal. <br /> 3. 4.09.1(1 1)(c)—This rule is not applicable during this phase of construction. <br /> 4. 4.10.2—All criteria for Rule 4.10.2 were met. <br /> The Division is providing the following additional notes regarding this report. <br /> • As requested by the Division, BRL has provided a discussion of the seeps at Gob Pile#2. <br /> • Cleaning has been suggested on the upper diversion ditch at Gob Pile #3 during <br /> 2019. This maintenance item was also noted in the 2nd Quarter Waste Bank <br /> Inspection Report as well and should be completed as soon as practical. <br /> • Inclinometer readings were provided for Gob Pile #2. As stated in the 2nd quarter report, <br /> displacement was noted within inclinometer BG05-05 in a direction perpendicular to the <br /> slope. This displacement was detected in the 3rd quarter as well, deeper in the gob pile. <br /> However, displacement was not detected in the downslope direction, suggesting that error <br /> (possibly in recording or with the instrument) could be the cause of the displacement <br /> perpendicular to the slope. The Division agrees with the findings of the report: this data <br /> Nr� �'. <br /> 0 <br /> 1313 Sherman Street, Room 215, Denver, CO 80203 P 303.866.3567 F 303.832.8106 http://mining.state.co.us <br /> Jared S. Polis, Governor I Dan Gibbs, Executive Director I Virginia Brannon, Director 1876� <br />
The URL can be used to link to this page
Your browser does not support the video tag.