My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-12-10_REPORT - C1996083
DRMS
>
Day Forward
>
Report
>
Coal
>
C1996083
>
2019-12-10_REPORT - C1996083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 3:35:54 PM
Creation date
12/11/2019 9:22:49 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Report
Doc Date
12/10/2019
Doc Name
Quarterly Waste Bank Inspection Report
From
DRMS
To
Zack Trujillo, Jason Musick
Annual Report Year
2013
Report Quarter_Month
3
Permit Index Doc Type
Waste Pile/Fill Report
Email Name
RDZ
JDM
ZTT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NEER,c 2789 Riverside Parkway <br /> Huddleston-Berry Grand Junction,Colorado 81501 <br /> �zn ineerin &Test �� l �` Phone:970-255-8005 <br /> 2t � <br /> g g � Info ghuddlestonberry.corn <br /> October 23, 2019 <br /> Project#01349-0001 <br /> Bowie Resources, LLC <br /> 43659 Bowie Road <br /> Paonia, Colorado 81428 <br /> Attention: Mr. Basil Bear <br /> Sub j ect: Construction Materials Testing <br /> 3rd Quarter 2019 <br /> Bowie Mine No. 2 <br /> Paonia, Colorado <br /> Dear Mr. Bear, <br /> At your request, a representative of Huddleston-Berry Engineering and Testing, LLC (HBET) <br /> conducted field moisture and compaction testing, and laboratory moisture testing of coal mine <br /> waste materials placed at Bowie Mine No. 2 near Paonia, Colorado. Field testing was conducted <br /> on July 3rd and August 22nd, 2019. Soil compaction test reports, test location data, and laboratory <br /> optimum moisture and density (Proctor) data are attached. <br /> We are pleased to be of service to your project. Please contact us if you have any questions or <br /> comments regarding the contents of this report. <br /> Respectfully Submitted: <br /> Huddleston-Berry Engineering and Testing, LLC <br /> AA <br /> Michael A. Berry, P.E. <br /> Vice President of Engineering <br />
The URL can be used to link to this page
Your browser does not support the video tag.